background image

“I” Running boards are On

“O” Running boards are Off

Thank you for choosing RBP!  We hope you enjoy your new 
Stealth Power Running Boards.  We would love to hear about 
your experience and see your vehicle decked out with our 
products.  To share simply tag us using #Rollingbigpower, 
#RBP or #RBPStealthPower or DM us on Facebook and 
Instagram and visit us on YouTube!

FOLLOW US

OfficialRBP

@rollingbigpower

RollingBigPowerTV

13

1-877-519-9090

INSTALLATION INSTRUCTIONS

Step 27: 

Install the left center console trim panel and tuck 

the disable switch harness behind the lower dash panel

Step 28:

 Remove the 20 Amp fuses from the main 

positive and negative 12V power leads on the main 
harness.  Route the power wires over the wheel well and 
into the engine compartment.  Connect the ring terminals 
to the battery positive and negative posts.

Step 29: 

Install the 20 Amp fuses back on the main 

negative and positive 12V power leads of the main power 
harness.

Step 30: 

Connect the battery. Begin with the positive 

terminal, followed by the negative terminal.

Step 31: 

Open and close all four doors to test the operation 

of your new Stealth Power Running boards. Please note that 
there is a 4 second delay for the running boards to retract 
after the doors are closed.

Step 32: 

Open the driver side door and keep the door open.  

Flip the disable switch to the “O”  or Off position.  This will 
signal the running boards to retract to the stowed position 
and it will disable any further operation until the switch is 
flipped to the “I” or On position.

Step 27

Step 30

Step 28

Disable switch

Lower dash panel

Содержание STEALTH POWER RBP-216-SP

Страница 1: ...INSTALLATION COVERS PART RBP 216 SP FOR APPLICATIONS 2009 2018 RAM 1500 CREW CAB INSTALLATION GUIDE...

Страница 2: ...PLICATIONS 2009 2018 RAM 1500 CREW CAB TOOLS REQUIRED 5 MM ALLEN WRENCH 13 MM SOCKET AND WRENCH 10 MM COMBINATION WRENCH ELECTRIC DRILL 10 MM NUT DRIVER TIP RAZOR BLADE RTV SILICONE 50 50 MIX OF ISOPR...

Страница 3: ...3 1 877 519 9090 CONTENTS ENGLISH Product Technical Specifications 04 Product Packing List 05 Installation 07 Warranty Information 14...

Страница 4: ...ends Step Height 12 4 Vertical height difference between the edge of power board and the vehicle door while board extending WARNING Keep a minimum of 10 safe distance while the Stealth Power Running B...

Страница 5: ...for assistance Left Front Motor Linkage 20 1 Left Rear Motor Linkage 20 1 Right Front Motor Linkage 20 1 Right Rear Motor Linkage 20 1 Hexagon Flange Bolt 8 20A Fuse 2 LED Lamp Module 4 Wired Magnetic...

Страница 6: ...tor plug a six conductor plug a black two conductor plug and a red two conductor plug Controller Assembly Motor Motor Motor Motor LED lights LED lights LED lights LED lights High Temperature Protectiv...

Страница 7: ...bracket through the slot and let it hang from the small tab as shown Hang Tab Installation Position FRONT INSTALLATION INSTRUCTIONS Step 1 Step 4 Step 3 Rear Driver Side Motor Mounting point Front Dr...

Страница 8: ...when installing the running board Step 6 Install the Driver Side running board 6a Begin by propping up the running board on the front and rear motor assembly bases 6b Next align the sliding T Nut ass...

Страница 9: ...ame rail of the truck Connect the male plug connector on the wire harness into the female socket on the motor The harness is labeled Front Left for the front Driver motor and Rear Left for the rear dr...

Страница 10: ...cker panel Stick the LED lights at the center of the front and rear passenger side doors Step 16 On the driver side remove the front kick panel front door sill trim panel b pillar trim panel and pull...

Страница 11: ...of the latch Prepare the surface by cleaning with a 50 50 mix of isopropyl alcohol and water or equivalent Once the surface is completely dry peel the backing from the double sided tape and stick the...

Страница 12: ...equivalent Once the surface is completely dry peel the backing from the double sided tape and stick the magnet to the door Align the top edge of the magnet with the tape and the right side of the mag...

Страница 13: ...the power wires over the wheel well and into the engine compartment Connect the ring terminals to the battery positive and negative posts Step 29 Install the 20 Amp fuses back on the main negative an...

Страница 14: ...idate your warranty by REGISTERING YOUR RBP PRODUCT NOTE If you purchased an RBP product from an unauthorized reseller the unauthorized reseller your warranty may or may not be honored It is strongly...

Страница 15: ...rranty registration as noted above Purchased from an unauthorized reseller Failure due to misuse abuse neglect or impact collision Any cosmetic scratches or discoloration or any other cosmetic conditi...

Страница 16: ...16 WWW ROLLINGBIGPOWER COM WWW ROLLINGBIGPOWER COM 1 877 519 9090 FOLLOW US...

Отзывы: