10
WWW.ROLLINGBIGPOWER.COM
INSTALLATION INSTRUCTIONS
Step 14
: Install the controller bracket using two M8
flange bolts and on M8 Hex Nut for the bottom bolt.
Using a torque wrench, tighten to 18 ft-lb.
Step 15:
Align the arrows on the small round
connectors and plug the passenger side front and
passenger side rear LED lights. Prepare the surface
by cleaning with a 50/50 mix of isopropyl alcohol and
water or equivalent. Once the surface is completely
dry, peel the backing from the double-sided tape and
stick the LEDs to the bottom side of the rocker panel.
Stick the LED lights at the center of the front and rear
passenger side doors.
Step 16:
On the driver side, remove the front kick
panel, front door sill trim panel, b-pillar trim panel
and pull the front driver carpet back. Now go under
the truck and locate the plastic grommet on the driver
side floorboard. Drill a 7/16” hole as shown.Make
sure not to drill through the carpet. We recommend
placing something between the floorboard and the
carpet to keep it away from the drill bit when it
breaks through.
Step 17:
Feed the door trigger signal wires (white
and brown) and the disable switch wires (two black
wires) into the cab. Seal around the wires using RTV
silicone adhesive to prevent water intrusion.
Step 14
Step 15
Step 16
Step 17
Step 18