RBI FUTERA FUSION CB-1000 Скачать руководство пользователя страница 36

36

FUTERA FUSION INSTALLATION AND OPERATION INSTRUCTIONS

 

NS 

Pump 

Contactor 

(C1, 

C2) 

15-0118 1  1 1 1 1 1 1 

 

51 

Purge 

Timer, 

ST7800 

16-0007 1  1 1 1 1 1 1 

 

52 

Spark 

Generator, 

Q652B 

16-0008 1  1 1 1 1 1 1 

 

53 

Flame 

Safeguard, 

RM7897C 

16-0024 1  1 1 1 1 1 1 

 

54 

Main 

Board 

40-0068 1  1 1 1 1 1 1 

 

55 

Display 

Board 

40-0069 1  1 1 1 1 1 1 

 

NS 

Ribbon 

Cable 

40-0115 1  1 1 1 1 1 1 

 

NS 

Toggle 

Switch 

48-0010 1  1 1 1 1 1 1 

 

56 

Air 

Pressure 

Switch 

11-0416 1  1 1 1 1 1 1 

 

57 

Blocked 

Flue 

Switch 

11-0411 1  1 1 1 1 1 1 

 

NS 

Terminal 

Block 

6P 

48-0157 1  1 1 1 1 1 1 

 

NS 

Terminal 

Block 

4P 

48-0161 1  1 1 1 1 1 1 

 

NS 

Resistor 

Assembly 

70-9001 1  1 1 1 1 1 1 

 

NS 

Mini 

Peeper, 

C7027A 

16-0009 1  1 1 1 1 1 1 

 

NS 

UV 

Amplifi 

er, 

R7849A 

16-0006 1  1 1 1 1 1 1 

 

NS 

Base, 

Q7800A 

16-0003 1  1 1 1 1 1 1 

 

NS 

Ignition 

Cable 

44-0056 1  1 1 1 1 1 1 

 

58 

Pilot/Flame 

Rod 

Kit 

70-2303 

1 1 

    

 

 

 

70-2304      1 1 1 1 

 

58a 

Electrode 

16-0333 2  2 2 2 2 2 2 

 

5b 

Electrode 

Gasket 

06-0024 

1 1 

    

 

 

 

06-0025      1 1 1 1 

 

58c 

View 

Port 

Assembly 

70-2205 1  1 1 1 1 1 1 

 

59 

Control 

Box 

Panel 

70-2376 

1 1 

    

 

 

 

70-2377      1 1 1 1 

 

NS 

Harness 

RM7800 

40-0117 1  1 1 1 1 1 1 

 

NS 

Harness 

120V 

Switch 

40-0118 1  1 1 1 1 1 1 

 

NS 

Harness 

Tekmar 

40-0119 1  1 1 1 1 1 1 

 

NS 

Harness 

Transformer 

40-0120 1  1 1 1 1 1 1 

 

NS 

Harness 

VFD 

40-0121 1  1 1 1 1 1 1 

 

60 

Transition 

Assembly 

70-2305 

1 1 

    

 

 

 

70-2306      1 1 1 1 

 

60a 

Gasket 

06-0043 

1 1 

    

 

 

 

06-0044      1 1 1 1 

 

61 

Pump 

Contactor 

Relay 

15-0118 1  1 1 2 2 2 2 

 

62 

Left & Right Side Jacket Panel Extension 

03-3101 

 

 

 

 

 

 

 

 

 

03-3102 

 2      

 

 

 

03-3103 

   2 

    

 

 

 

03-3104 

    

2    

 

 

 

03-3105       2    

 

 

 

03-3106 

      2  

 

 

 

03-3107 

       2 

 

63 

Jacket 

Top 

Panel 

Extension 

03-3108 

1 1 

    

 

 

 

03-3109 

    

1   

 

 

 

03-3110 

      1 

 

64 

Economizer 

Mounting 

Bracket 

03-3118 

1 1      

 

 

 

03-3119 

   1 

    

 

 

 

03-3120      1 1 1 1 

 

65 

Condensate 

Drain 

Assembly 

70-4001 1  1 1 1 1 1 1 

 

66 

Economizer 

12-2001 

1 1 

    

 

 

 

12-2002 

    

1   

 

 

 

12-2003 

      1 

 

67 

Condensate 

Hose 

(ft) 

62-0301 3  3 3 3 3 3 3 

 

68 

Thermostatic Valve (CB) 2" Cast Iron 

13-0201 

 

 

 

 

 

 

Thermostatic Valve (CB) 2 1/2" Cast Iron 

13-0202 

 

 

 

 

 

Thermostatic 

Valve 

(CW) 

2" 

Bronze  13-0203 

1 1 

    

 

 

Thermostatic Valve (CW) 2 1/2" Bronze 

13-0204 

 

 

 

 69  Pump 

 

 

 

(see pump selection chart in Trade Price Book) 

 

 

 

70 

Top Horizontal Frame Extension Profi le 

04-1069 

 

 

 

 

 

 

 

04-1071      2 2 2 2 

 

Futera Fusion Model Size with Item Quantities Below

  Ref # 

Name of Part 

Part # 

500 

750 

1000 

1250 

1500 

1750 

2000

Содержание FUTERA FUSION CB-1000

Страница 1: ...or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch D...

Страница 2: ...tretien doivent tre assur s par un installateur ou un service d entretien qualifi ou par le fournisseur de gaz The Futera Fusion Series finned copper heating boiler water heaters have been design cert...

Страница 3: ...duction of combustion air into the unit or subject it to a negative pressure see GENERAL VENTING GUIDELINES 6 NEVER place this boiler water heater in a location that would subject it to temperatures a...

Страница 4: ...given to the blockage effects of louvers grills and screens Screens must have a minimum mesh size of 1 4 in 6 4 mm If the free area through a louver or grill is not known ducts should be sized per Tab...

Страница 5: ...r terminal are equal to 10 linear ft 3 0 m of pipe see Table 3 An approved nonrestrictive intake air terminal must be used The intake air terminal must terminate as shown in Figure 3 The penetration p...

Страница 6: ...400 F 204 C Horizontal vent systems shall terminate at least 4 ft 1 2 m below 4 ft 1 2 m horizontally from or 1 ft 0 30 m above any door window or gravity air inlet into any building It must not term...

Страница 7: ...ts exhaust and combustion air terminals must be installed on the same plane outside wall in order to prevent pressure differences due to prevailing winds In cold climates double wall or insulated inle...

Страница 8: ...N AND OPERATION INSTRUCTIONS Figure 3 Vertical Air Intake and Venting for Direct Vent System Figure 4 Combination Direct Vent Systems 10 FT 3 1 m 4 FT 1 2 m 5 FT 1 5 m 1 5 FT 0 5 m 5 1 2 FT 1 7 m 1 5...

Страница 9: ...ower is used to push the flue products horizontally to the outdoors see Figure 5 The air for combustion is taken from the space in which the unit is installed The applicable instructions under the COM...

Страница 10: ...10 FUTERA FUSION INSTALLATION AND OPERATION INSTRUCTIONS Figure 6 Vertical Venting with a Metal Chimney System 10 FT 3 1 m...

Страница 11: ...e as shown in Figure 8 WARNING Never install any type of valve between the boiler water heater and the relief valve or an explosion causing extensive property damage severe personal injury or death ma...

Страница 12: ...igure 8 Futera Fusion Piping Air Vent Aquastat Union Automatic Thermometer Flow Switch Pressure Relief Valve Reducing Valve Check Valve Pressure Pump Valve Balance Valve Vacuum Relief Valve Temperatur...

Страница 13: ...lve and piping Low Water Cutoff If a boiler is installed above any radiation elements it must be fitted with a low water cutoff device Refer to the wiring diagram supplied with the boiler water heater...

Страница 14: ...ated on pump flange On multiple boiler installations the flow switch may fail due to trapped air See manual for procedure 3 All boilers furnished with factory mounted outlet water temperature gauge No...

Страница 15: ...filled Use purge valves provided Purge valve may be located on pump flange On multiple boiler installations the flow switch may fail due to trapped air See manual for procedure 4 All boilers furnished...

Страница 16: ...usion water heater is 97 GPM 6 1 L s on 500 through 1000 models and 136 GPM 8 9 L s for 1250 through 2000 models The cupro nickel heat exchanger allows for 108 GPM 6 8 L s on 500 through 1000 models a...

Страница 17: ...xchanger Selection Graph To properly size the pump a grain hardness and pH test must be taken at the installation site before the order is placed Proper pump sizing will improve heater performance and...

Страница 18: ...be equipped with a combination temperature pressure relief valve 6 MA Code requires an 1 8 hole in check valve to compensate for thermal expansion 7 Use balance valve to set the temperature rise throu...

Страница 19: ...equipped with a combination temperature pressure relief valve 6 MA Code requires an 1 8 hole in check valve to compensate for thermal expansion 7 Use balance valve to set the temperature rise through...

Страница 20: ...make sure that the boiler water heater is for the type of gas that will be used If it isn t do not connect the boiler water heater to the gas supply Gas supply piping must be in accordance with the N...

Страница 21: ...roceeding read and fully understand the instructions contained in this manual Do not attempt to operate this boiler water heater if it has not been installed in accordance with the guidelines set fort...

Страница 22: ...voisin Suives les instructions du fournisseur Si vous ne pouvez rejoindre le fournisseur appelez le service de incendies C Do not use this appliance if any part has been under water Immediately call...

Страница 23: ...allumage 14 R glez la pression de la veilleuse tel qu indiqu la section V RIFICATION ET R GLAGES 15 Commutez nouveau le Honeywell 7897C en mode marche 10 Monitor the flame current on the Honeywell Bu...

Страница 24: ...ith the main and pilot gas manual valves in the closed position energize the unit Observe the trial for ignition to confirm that the spark is strong and continuous If not check and adjust the spark ga...

Страница 25: ...gulations install a low water cutoff in appropriate piping Wire the switch and any external controls in series to the Interlock contacts in the junction box see the attached Connection Diagrams for de...

Страница 26: ...the boiler water heater when the operating sensor is 1 2 of the differential setting below the boiler target temperature and will stop the boiler water heater once the modulating output is at the mini...

Страница 27: ...OCKOUT HI LIMIT GAS PRESSURE Indicates that both the high limit and gas pressure interlocks are open MULTIPLE INTERLOCK Indicates that there are more than 2 interlocks that are open Check the high lim...

Страница 28: ...tubes and remove 5 Install and swage expand in place the new tube s 6 Replace the pipe plugs using a suitable thread sealant on each one 7 Sagging or distorted heat exchanger tubes are an indication...

Страница 29: ...Wire power venter as shown in connection power venter external power diagram Defective power venter timer TD1 Replace power venter timer TD1 Defective flame sense relay Replace flame sense relay Powe...

Страница 30: ...uring ignition trial adjust as necessary Defective flame sense relay Replace flame sense relay Main valve malfunctioning Replace main valve Insufficient heating Target temperature set too low Increasi...

Страница 31: ...TION AND OPERATION INSTRUCTIONS Figure 18 Exploded View RIOM 20 REV B SEE VIEW A SEE VIEW B 15B 15A 41 32 36 57 46 13 35 40 33 31 23 27 60A 24 62 28 47 39 15 SEE VIEW C 38 37 25 67 66 62 65 30 63 43 4...

Страница 32: ...32 FUTERA FUSION INSTALLATION AND OPERATION INSTRUCTIONS 74 1 73 71 12 8 70 10 71 72 3 8 3 8 1 8 75 76 6 10 4 11 75 12 5 9 5 10 1 2 1 2 4 12 70 7 VIEW C RIOM 73 VIEW B ROTATED VIEW 16 18 VIEW A...

Страница 33: ...2 2 04 1074 2 2 2 2 14 Gas Train Support Bracket Assembly 70 2344 1 1 70 2345 1 1 1 70 2346 1 1 15 Burner 10 0280 1 10 0309 1 10 0308 1 10 0286 1 10 0288 1 10 0290 1 10 0292 1 15a Burner Gasket 06 002...

Страница 34: ...e KBVF 14W 15 0227 1 1 1 Frequency Drive KBVF26D 15 0226 1 1 1 1 27 Jacket Top Panel 70 2412 1 1 1 70 2413 1 1 1 1 28 Upper Rear Panel 70 2414 1 1 1 70 2415 1 1 1 1 29 Rear Pipe Enclosure Assembly 70...

Страница 35: ...icator CB 30 50 psi 13 0308 1 1 1 1 1 1 1 Tridicator CB 60 160 psi 13 0305 1 1 1 1 1 1 1 46 Heat Exchanger Copper 70 2186 1 70 2187 1 70 2188 1 70 2189 1 70 2190 1 70 2191 1 70 2192 1 Heat Exchanger C...

Страница 36: ...1 1 70 2377 1 1 1 1 NS Harness RM7800 40 0117 1 1 1 1 1 1 1 NS Harness 120V Switch 40 0118 1 1 1 1 1 1 1 NS Harness Tekmar 40 0119 1 1 1 1 1 1 1 NS Harness Transformer 40 0120 1 1 1 1 1 1 1 NS Harness...

Страница 37: ...4 1 1 1 1 1 1 1 NS Futera Fusion Overlay 82 0195 1 1 1 1 1 1 1 NS Paint 66 0013 1 1 1 1 1 1 1 NS Silicone 66 0151 1 1 1 1 1 1 1 OPTIONS NS Alarm Bell 70 2232 1 1 1 1 1 1 1 NS Main Flame Status Contact...

Страница 38: ...ated on the display board Also locate the gas pressure tapping upstream of the main gas valve 1 Cycle boiler and hold at trial for pilot ignition 2 Set pressure to 2 2 5 W C Flame signal should read 5...

Страница 39: ...WITCH HIGH LIMIT COMMISSIONING THE BOILER WATER HEATER UNIT CYCLED MIN OF 15 TIMES CUSTOMER INSTRUCTED ALL COVERS REPLACED CUSTOMER GIVEN MANUAL TARGET TEMP SET PER CUSTOMER COMMISSIONED BY __________...

Страница 40: ...www rbiwaterheaters com 260 North Elm Street 7555 Tranmere Drive Westfield MA 01085 Mississauga Ontario L5S 1L4 Canada Phone 413 568 9571 Phone 905 670 5888 Fax 413 568 9613 Fax 905 670 5782...

Отзывы: