FUTERA FUSION INSTALLATION AND OPERATION INSTRUCTIONS

RATINGS & CAPACITIES

 

Before under taking the installation of the Futera 
Fusion Series boiler/water heater check the rating 
plate to ensure that the unit has been sized properly 
for the job. The “Net I=B=R Ratings” specify the 
equivalent amount of direct cast iron radiation that 
the unit can supply under normal conditions.  Also 
ensure that the unit has been set up for the type of 
gas available at the installation site. Other important 
considerations are the availability of an adequate electrical 
supply, fresh air for combustion and a suitable chimney or 
vent system.

BOILER/WATER HEATER LOCATION

 

1.   This boiler/water heater is suitable for indoor  

installations. Locate the boiler/water heater in an area 
that provides good access to the unit. Servicing may 
require the removal of jacket panels. Allow the 
minimum clearances between adjacent construction 
and the boiler/water heater as listed in Table 1. 

NOTE: Service clearances are not mandatory, but are 
recommended to ensure ease of service should it be 
required.

Table 1 
 

Clearance to  

  Service

 Combustibles 

 

Clearance

   

in 

mm

 in 

mm

Top 

6

  

153

 

30

  

762

Back 

6

 

153

 

24

  

610

Left Side 

6

 

153

 

24

  

610

Right Side 

6

  

153

 

24

 

610

Front 

6

 

153

 

30

 

762

2.   An optimum site will be level, central to the piping 

system, close to a chimney or outside wall and have 
adequate fresh air for combustion. Ensure that the 
boiler/water heater is level from front to back and from 
side to side. Use metal shims to level the boiler/water 
heater. Electrical and electronic components must also 
be protected from exposure to water during operation 
and maintenance. DO NOT install this boiler/water 
heater in a location that would subject any of the gas 
ignition components to direct contact with water or 
excessive moisture during operation or servicing. 

3.   Ensure that the fl oor is structurally sound and will 

support the weight of the boiler/water heater.

NOTE: The Futera Fusion may be installed directly on 
combustible fl ooring, but never on carpeting.

4.   Locate the boiler/water heater in an area that will 

prevent water damage to adjacent construction should 
a leak occur or during routine maintenance. If such 
a location doesn’t exist, a suitable drain pan that’s 
adequately drained must be installed under the unit.

5.   DO NOT place this boiler/water heater in a location that 

would restrict the introduction of combustion air into 
the unit or subject it to a negative pressure, see 
“GENERAL VENTING GUIDELINES”.

6.   NEVER place this boiler/water heater in a location that 

would subject it to temperatures at or near freezing, 
see the “FREEZE PROTECTION” section on page 11.

WARNING: Never store combustible materials, 
gasoline or any product containing flammable 
vapors or liquids in the vicinity of the boiler/water 
heater. Failure to comply with this warning can 
result in an explosion or fire causing extensive 
property damage, severe personal injury or death!

COMBUSTION AIR & VENTILATION

WARNING: This boiler/water heater must be 
supplied with combustion air in accordance with 
Section 5.3, Air for Combustion & Ventilation, of the 
latest revision of the National Fuel Gas Code, ANSI 
Z223.1/NFPA 54 and all applicable local building 
codes. Canadian installations must comply with 
CAN/ CGA B149.1 or .2 Installation Code for Gas 
Burning Appliances and Equipment, or applicable 
provisions of the local building codes. Failure to 
provide adequate combustion air for this boiler/
water heater can result in excessive levels of 
carbon monoxide which can result in severe 
personal injury or death!

To operate properly and safely this boiler/water heater 
requires a continuous supply of air for combustion. NEVER 
store objects on or around the boiler/water heater!

CAUTION: Combustion air contaminated with 
fl uorocarbons or other halogenated compounds such 
as cleaning solvents and refrigerants will result in the 
formation of acids in the combustion chamber. These 
acids will cause premature failure of the boiler/water 
heater voiding the warranty!

CAUTION: If the boiler/water heater is operated while 
the building is under construction it MUST be 
protected from wood, concrete, sheet rock and other 
types of dust. Failure to properly protect the unit from 
construction dust will damage the unit voiding the 
warranty!

Buildings will require the installation of a fresh air duct or 
other means of providing make-up air if the intake air option 
isn’t used. Any building utilizing other gas burning 
appliances, a fi replace, wood stove or any type of exhaust 
fan must be checked for adequate combustion air when all 
of these devices are in operation at one time. Sizing of an 
outside air duct must be done to meet the requirements 
of all such devices.

WARNING: Never operate the Futera Fusion in 
an environment subjected to a negative pressure 
unless it is Direct Vented.  Failure to comply with 
this warning can result in excessive levels of 
carbon monoxide causing severe personal injury 
or death!

Содержание FUTERA FUSION CB-1000

Страница 1: ...or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch D...

Страница 2: ...tretien doivent tre assur s par un installateur ou un service d entretien qualifi ou par le fournisseur de gaz The Futera Fusion Series finned copper heating boiler water heaters have been design cert...

Страница 3: ...duction of combustion air into the unit or subject it to a negative pressure see GENERAL VENTING GUIDELINES 6 NEVER place this boiler water heater in a location that would subject it to temperatures a...

Страница 4: ...given to the blockage effects of louvers grills and screens Screens must have a minimum mesh size of 1 4 in 6 4 mm If the free area through a louver or grill is not known ducts should be sized per Tab...

Страница 5: ...r terminal are equal to 10 linear ft 3 0 m of pipe see Table 3 An approved nonrestrictive intake air terminal must be used The intake air terminal must terminate as shown in Figure 3 The penetration p...

Страница 6: ...400 F 204 C Horizontal vent systems shall terminate at least 4 ft 1 2 m below 4 ft 1 2 m horizontally from or 1 ft 0 30 m above any door window or gravity air inlet into any building It must not term...

Страница 7: ...ts exhaust and combustion air terminals must be installed on the same plane outside wall in order to prevent pressure differences due to prevailing winds In cold climates double wall or insulated inle...

Страница 8: ...N AND OPERATION INSTRUCTIONS Figure 3 Vertical Air Intake and Venting for Direct Vent System Figure 4 Combination Direct Vent Systems 10 FT 3 1 m 4 FT 1 2 m 5 FT 1 5 m 1 5 FT 0 5 m 5 1 2 FT 1 7 m 1 5...

Страница 9: ...ower is used to push the flue products horizontally to the outdoors see Figure 5 The air for combustion is taken from the space in which the unit is installed The applicable instructions under the COM...

Страница 10: ...10 FUTERA FUSION INSTALLATION AND OPERATION INSTRUCTIONS Figure 6 Vertical Venting with a Metal Chimney System 10 FT 3 1 m...

Страница 11: ...e as shown in Figure 8 WARNING Never install any type of valve between the boiler water heater and the relief valve or an explosion causing extensive property damage severe personal injury or death ma...

Страница 12: ...igure 8 Futera Fusion Piping Air Vent Aquastat Union Automatic Thermometer Flow Switch Pressure Relief Valve Reducing Valve Check Valve Pressure Pump Valve Balance Valve Vacuum Relief Valve Temperatur...

Страница 13: ...lve and piping Low Water Cutoff If a boiler is installed above any radiation elements it must be fitted with a low water cutoff device Refer to the wiring diagram supplied with the boiler water heater...

Страница 14: ...ated on pump flange On multiple boiler installations the flow switch may fail due to trapped air See manual for procedure 3 All boilers furnished with factory mounted outlet water temperature gauge No...

Страница 15: ...filled Use purge valves provided Purge valve may be located on pump flange On multiple boiler installations the flow switch may fail due to trapped air See manual for procedure 4 All boilers furnished...

Страница 16: ...usion water heater is 97 GPM 6 1 L s on 500 through 1000 models and 136 GPM 8 9 L s for 1250 through 2000 models The cupro nickel heat exchanger allows for 108 GPM 6 8 L s on 500 through 1000 models a...

Страница 17: ...xchanger Selection Graph To properly size the pump a grain hardness and pH test must be taken at the installation site before the order is placed Proper pump sizing will improve heater performance and...

Страница 18: ...be equipped with a combination temperature pressure relief valve 6 MA Code requires an 1 8 hole in check valve to compensate for thermal expansion 7 Use balance valve to set the temperature rise throu...

Страница 19: ...equipped with a combination temperature pressure relief valve 6 MA Code requires an 1 8 hole in check valve to compensate for thermal expansion 7 Use balance valve to set the temperature rise through...

Страница 20: ...make sure that the boiler water heater is for the type of gas that will be used If it isn t do not connect the boiler water heater to the gas supply Gas supply piping must be in accordance with the N...

Страница 21: ...roceeding read and fully understand the instructions contained in this manual Do not attempt to operate this boiler water heater if it has not been installed in accordance with the guidelines set fort...

Страница 22: ...voisin Suives les instructions du fournisseur Si vous ne pouvez rejoindre le fournisseur appelez le service de incendies C Do not use this appliance if any part has been under water Immediately call...

Страница 23: ...allumage 14 R glez la pression de la veilleuse tel qu indiqu la section V RIFICATION ET R GLAGES 15 Commutez nouveau le Honeywell 7897C en mode marche 10 Monitor the flame current on the Honeywell Bu...

Страница 24: ...ith the main and pilot gas manual valves in the closed position energize the unit Observe the trial for ignition to confirm that the spark is strong and continuous If not check and adjust the spark ga...

Страница 25: ...gulations install a low water cutoff in appropriate piping Wire the switch and any external controls in series to the Interlock contacts in the junction box see the attached Connection Diagrams for de...

Страница 26: ...the boiler water heater when the operating sensor is 1 2 of the differential setting below the boiler target temperature and will stop the boiler water heater once the modulating output is at the mini...

Страница 27: ...OCKOUT HI LIMIT GAS PRESSURE Indicates that both the high limit and gas pressure interlocks are open MULTIPLE INTERLOCK Indicates that there are more than 2 interlocks that are open Check the high lim...

Страница 28: ...tubes and remove 5 Install and swage expand in place the new tube s 6 Replace the pipe plugs using a suitable thread sealant on each one 7 Sagging or distorted heat exchanger tubes are an indication...

Страница 29: ...Wire power venter as shown in connection power venter external power diagram Defective power venter timer TD1 Replace power venter timer TD1 Defective flame sense relay Replace flame sense relay Powe...

Страница 30: ...uring ignition trial adjust as necessary Defective flame sense relay Replace flame sense relay Main valve malfunctioning Replace main valve Insufficient heating Target temperature set too low Increasi...

Страница 31: ...TION AND OPERATION INSTRUCTIONS Figure 18 Exploded View RIOM 20 REV B SEE VIEW A SEE VIEW B 15B 15A 41 32 36 57 46 13 35 40 33 31 23 27 60A 24 62 28 47 39 15 SEE VIEW C 38 37 25 67 66 62 65 30 63 43 4...

Страница 32: ...32 FUTERA FUSION INSTALLATION AND OPERATION INSTRUCTIONS 74 1 73 71 12 8 70 10 71 72 3 8 3 8 1 8 75 76 6 10 4 11 75 12 5 9 5 10 1 2 1 2 4 12 70 7 VIEW C RIOM 73 VIEW B ROTATED VIEW 16 18 VIEW A...

Страница 33: ...2 2 04 1074 2 2 2 2 14 Gas Train Support Bracket Assembly 70 2344 1 1 70 2345 1 1 1 70 2346 1 1 15 Burner 10 0280 1 10 0309 1 10 0308 1 10 0286 1 10 0288 1 10 0290 1 10 0292 1 15a Burner Gasket 06 002...

Страница 34: ...e KBVF 14W 15 0227 1 1 1 Frequency Drive KBVF26D 15 0226 1 1 1 1 27 Jacket Top Panel 70 2412 1 1 1 70 2413 1 1 1 1 28 Upper Rear Panel 70 2414 1 1 1 70 2415 1 1 1 1 29 Rear Pipe Enclosure Assembly 70...

Страница 35: ...icator CB 30 50 psi 13 0308 1 1 1 1 1 1 1 Tridicator CB 60 160 psi 13 0305 1 1 1 1 1 1 1 46 Heat Exchanger Copper 70 2186 1 70 2187 1 70 2188 1 70 2189 1 70 2190 1 70 2191 1 70 2192 1 Heat Exchanger C...

Страница 36: ...1 1 70 2377 1 1 1 1 NS Harness RM7800 40 0117 1 1 1 1 1 1 1 NS Harness 120V Switch 40 0118 1 1 1 1 1 1 1 NS Harness Tekmar 40 0119 1 1 1 1 1 1 1 NS Harness Transformer 40 0120 1 1 1 1 1 1 1 NS Harness...

Страница 37: ...4 1 1 1 1 1 1 1 NS Futera Fusion Overlay 82 0195 1 1 1 1 1 1 1 NS Paint 66 0013 1 1 1 1 1 1 1 NS Silicone 66 0151 1 1 1 1 1 1 1 OPTIONS NS Alarm Bell 70 2232 1 1 1 1 1 1 1 NS Main Flame Status Contact...

Страница 38: ...ated on the display board Also locate the gas pressure tapping upstream of the main gas valve 1 Cycle boiler and hold at trial for pilot ignition 2 Set pressure to 2 2 5 W C Flame signal should read 5...