FUTERA FUSION INSTALLATION AND OPERATION INSTRUCTIONS

WARNING: Never use an open fl ame to test for gas 
leaks. Always use an approved leak detection 
method. Failure to comply with this warning can 
cause extensive property damage, severe personal 
injury or death!

Whenever the gas supply piping is pressure tested the 
boiler/water heater gas controls must be protected. If the 
test pressure is equal to, or less than 

1/2 psig

3.5 kPa

 

isolate the boiler/water heater by closing it’s manual shut 
off valve, see Figure 14. If the test pressure is greater than, 
or equal to 

1/2 psig

3.5 kPa

, disconnect the boiler/water 

heater and its individual shut-off valve.

ELECTRICAL WIRING 

Electrical Power Connections

CAUTION: Label all wires prior to disconnection when 
servicing controls. Wiring errors can cause improper 
and dangerous operation! Verify proper operation after 
servicing.

AT T E N T I O N :  Au   m o m e n t   d e   l ’ e n t r e t i e n   d e s 
commandes, étiquetez tous les fils avant de les 
débrancher. Des erreurs de câblage peuvent entraîner 
un fonctionnement inadéquat et dangereux. S’assurer 
que l’appareil fonctionne adéquatement une fois 
l’entretirn terminé.

The electrical connections to this boiler/water heater must 
be made in accordance with all applicable local codes and 
the latest revision of the National Electrical Code, ANSI/
NFPA-70. Installation should also conform with CSA C22.1 
Canadian Electrical Code Part I if installed in Canada. 

Install a separate 120 volt 15 amp circuit for the boiler/water 
heater. A properly rated shut-off switch should be located 
at the boiler/water heater. The boiler/water heater must be 
grounded in accordance with the authority having 
jurisdiction, or if none, the latest revision of the National 
Electrical Code, ANSI/NFPA-70.

Line voltage fi eld wiring of any controls or other devices 
must conform to the temperature limitation of type T wire 
at 

95°F

35°C

 above room temperature. Use copper 

conductors with a minimum size of #14 awg.  

Refer to the wiring diagram supplied with the boiler/water 
heater for proper wiring connections.

GENERAL OPERATION

WARNING: Before proceeding read and fully 
understand the instructions contained in this 
manual. Do not attempt to operate this boiler/water 
heater if it has not been installed in accordance 
with the guidelines set forth in this manual. Failure 
to comply with this warning can result in extensive 
property  damage, severe personal injury or death!

Should overheating occur or the gas supply fail to shut off, 
turn off the manual gas control valve to the appliance. Do 
not interrupt water fl ow through the boiler/water heater.

En cas de surchauffe ou si l’alimentation en gaz ne s’arrête 
pas, fermez manuellement le robinet d’arrêt de l’admission 
de gaz.

Hydronic Heating Boilers (Fill System)

 

Open the make-up water valve and slowly fi ll the boiler and 
all of the radiation with water. Ensure that all bleed and 
drain valves are closed.

Adjust the make-up water pressure regulator so a minimum 

12 psig

82.7 kPa

 system pressure is maintained at the 

highest point in the system piping. If a make-up water pump 
is used adjust it to maintain a minimum 

12 psig

82.7 kPa

 

system pressure.

Open the boiler piping bleed valves one at a time, to 
purge the air trapped in the primary and secondary 
heat exchanger. Refer to piping drawings (Figures 9 & 
11) for bleed locations.

With the boiler off, run the system pump for at least 30 
minutes and bleed the system piping using the bleed 
valves. If strainers are used in the system piping, the make- 
up water valve should be closed and the strainers checked 
and cleaned.

The system expansion tank should be checked to ensure 
that the correct water level in the tank is maintained. The 
tank should be less than half full of water with the system 
full and adjusted to the correct operating pressure.

Star t the boiler as described in the “OPERATING 
INSTRUCTIONS” section. Run the boiler for at least an 
hour. The system pump(s) and all radiation units must be 
operated during this time. Ensure that the make-up water 
valve is open.

Shut the boiler off and open the bleed valves to purge the 
air trapped in the heating system piping. Close the make-
up water valve and check and clean the strainers and 
make-up water pressure reducing valve.

Open the make-up water valve and adjust the system 
pressure if necessary. The system should be checked and 
bled after three days of operation.

Содержание FUTERA FUSION CB-1000

Страница 1: ...or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch D...

Страница 2: ...tretien doivent tre assur s par un installateur ou un service d entretien qualifi ou par le fournisseur de gaz The Futera Fusion Series finned copper heating boiler water heaters have been design cert...

Страница 3: ...duction of combustion air into the unit or subject it to a negative pressure see GENERAL VENTING GUIDELINES 6 NEVER place this boiler water heater in a location that would subject it to temperatures a...

Страница 4: ...given to the blockage effects of louvers grills and screens Screens must have a minimum mesh size of 1 4 in 6 4 mm If the free area through a louver or grill is not known ducts should be sized per Tab...

Страница 5: ...r terminal are equal to 10 linear ft 3 0 m of pipe see Table 3 An approved nonrestrictive intake air terminal must be used The intake air terminal must terminate as shown in Figure 3 The penetration p...

Страница 6: ...400 F 204 C Horizontal vent systems shall terminate at least 4 ft 1 2 m below 4 ft 1 2 m horizontally from or 1 ft 0 30 m above any door window or gravity air inlet into any building It must not term...

Страница 7: ...ts exhaust and combustion air terminals must be installed on the same plane outside wall in order to prevent pressure differences due to prevailing winds In cold climates double wall or insulated inle...

Страница 8: ...N AND OPERATION INSTRUCTIONS Figure 3 Vertical Air Intake and Venting for Direct Vent System Figure 4 Combination Direct Vent Systems 10 FT 3 1 m 4 FT 1 2 m 5 FT 1 5 m 1 5 FT 0 5 m 5 1 2 FT 1 7 m 1 5...

Страница 9: ...ower is used to push the flue products horizontally to the outdoors see Figure 5 The air for combustion is taken from the space in which the unit is installed The applicable instructions under the COM...

Страница 10: ...10 FUTERA FUSION INSTALLATION AND OPERATION INSTRUCTIONS Figure 6 Vertical Venting with a Metal Chimney System 10 FT 3 1 m...

Страница 11: ...e as shown in Figure 8 WARNING Never install any type of valve between the boiler water heater and the relief valve or an explosion causing extensive property damage severe personal injury or death ma...

Страница 12: ...igure 8 Futera Fusion Piping Air Vent Aquastat Union Automatic Thermometer Flow Switch Pressure Relief Valve Reducing Valve Check Valve Pressure Pump Valve Balance Valve Vacuum Relief Valve Temperatur...

Страница 13: ...lve and piping Low Water Cutoff If a boiler is installed above any radiation elements it must be fitted with a low water cutoff device Refer to the wiring diagram supplied with the boiler water heater...

Страница 14: ...ated on pump flange On multiple boiler installations the flow switch may fail due to trapped air See manual for procedure 3 All boilers furnished with factory mounted outlet water temperature gauge No...

Страница 15: ...filled Use purge valves provided Purge valve may be located on pump flange On multiple boiler installations the flow switch may fail due to trapped air See manual for procedure 4 All boilers furnished...

Страница 16: ...usion water heater is 97 GPM 6 1 L s on 500 through 1000 models and 136 GPM 8 9 L s for 1250 through 2000 models The cupro nickel heat exchanger allows for 108 GPM 6 8 L s on 500 through 1000 models a...

Страница 17: ...xchanger Selection Graph To properly size the pump a grain hardness and pH test must be taken at the installation site before the order is placed Proper pump sizing will improve heater performance and...

Страница 18: ...be equipped with a combination temperature pressure relief valve 6 MA Code requires an 1 8 hole in check valve to compensate for thermal expansion 7 Use balance valve to set the temperature rise throu...

Страница 19: ...equipped with a combination temperature pressure relief valve 6 MA Code requires an 1 8 hole in check valve to compensate for thermal expansion 7 Use balance valve to set the temperature rise through...

Страница 20: ...make sure that the boiler water heater is for the type of gas that will be used If it isn t do not connect the boiler water heater to the gas supply Gas supply piping must be in accordance with the N...

Страница 21: ...roceeding read and fully understand the instructions contained in this manual Do not attempt to operate this boiler water heater if it has not been installed in accordance with the guidelines set fort...

Страница 22: ...voisin Suives les instructions du fournisseur Si vous ne pouvez rejoindre le fournisseur appelez le service de incendies C Do not use this appliance if any part has been under water Immediately call...

Страница 23: ...allumage 14 R glez la pression de la veilleuse tel qu indiqu la section V RIFICATION ET R GLAGES 15 Commutez nouveau le Honeywell 7897C en mode marche 10 Monitor the flame current on the Honeywell Bu...

Страница 24: ...ith the main and pilot gas manual valves in the closed position energize the unit Observe the trial for ignition to confirm that the spark is strong and continuous If not check and adjust the spark ga...

Страница 25: ...gulations install a low water cutoff in appropriate piping Wire the switch and any external controls in series to the Interlock contacts in the junction box see the attached Connection Diagrams for de...

Страница 26: ...the boiler water heater when the operating sensor is 1 2 of the differential setting below the boiler target temperature and will stop the boiler water heater once the modulating output is at the mini...

Страница 27: ...OCKOUT HI LIMIT GAS PRESSURE Indicates that both the high limit and gas pressure interlocks are open MULTIPLE INTERLOCK Indicates that there are more than 2 interlocks that are open Check the high lim...

Страница 28: ...tubes and remove 5 Install and swage expand in place the new tube s 6 Replace the pipe plugs using a suitable thread sealant on each one 7 Sagging or distorted heat exchanger tubes are an indication...

Страница 29: ...Wire power venter as shown in connection power venter external power diagram Defective power venter timer TD1 Replace power venter timer TD1 Defective flame sense relay Replace flame sense relay Powe...

Страница 30: ...uring ignition trial adjust as necessary Defective flame sense relay Replace flame sense relay Main valve malfunctioning Replace main valve Insufficient heating Target temperature set too low Increasi...

Страница 31: ...TION AND OPERATION INSTRUCTIONS Figure 18 Exploded View RIOM 20 REV B SEE VIEW A SEE VIEW B 15B 15A 41 32 36 57 46 13 35 40 33 31 23 27 60A 24 62 28 47 39 15 SEE VIEW C 38 37 25 67 66 62 65 30 63 43 4...

Страница 32: ...32 FUTERA FUSION INSTALLATION AND OPERATION INSTRUCTIONS 74 1 73 71 12 8 70 10 71 72 3 8 3 8 1 8 75 76 6 10 4 11 75 12 5 9 5 10 1 2 1 2 4 12 70 7 VIEW C RIOM 73 VIEW B ROTATED VIEW 16 18 VIEW A...

Страница 33: ...2 2 04 1074 2 2 2 2 14 Gas Train Support Bracket Assembly 70 2344 1 1 70 2345 1 1 1 70 2346 1 1 15 Burner 10 0280 1 10 0309 1 10 0308 1 10 0286 1 10 0288 1 10 0290 1 10 0292 1 15a Burner Gasket 06 002...

Страница 34: ...e KBVF 14W 15 0227 1 1 1 Frequency Drive KBVF26D 15 0226 1 1 1 1 27 Jacket Top Panel 70 2412 1 1 1 70 2413 1 1 1 1 28 Upper Rear Panel 70 2414 1 1 1 70 2415 1 1 1 1 29 Rear Pipe Enclosure Assembly 70...

Страница 35: ...icator CB 30 50 psi 13 0308 1 1 1 1 1 1 1 Tridicator CB 60 160 psi 13 0305 1 1 1 1 1 1 1 46 Heat Exchanger Copper 70 2186 1 70 2187 1 70 2188 1 70 2189 1 70 2190 1 70 2191 1 70 2192 1 Heat Exchanger C...

Страница 36: ...1 1 70 2377 1 1 1 1 NS Harness RM7800 40 0117 1 1 1 1 1 1 1 NS Harness 120V Switch 40 0118 1 1 1 1 1 1 1 NS Harness Tekmar 40 0119 1 1 1 1 1 1 1 NS Harness Transformer 40 0120 1 1 1 1 1 1 1 NS Harness...

Страница 37: ...4 1 1 1 1 1 1 1 NS Futera Fusion Overlay 82 0195 1 1 1 1 1 1 1 NS Paint 66 0013 1 1 1 1 1 1 1 NS Silicone 66 0151 1 1 1 1 1 1 1 OPTIONS NS Alarm Bell 70 2232 1 1 1 1 1 1 1 NS Main Flame Status Contact...

Страница 38: ...ated on the display board Also locate the gas pressure tapping upstream of the main gas valve 1 Cycle boiler and hold at trial for pilot ignition 2 Set pressure to 2 2 5 W C Flame signal should read 5...

Страница 39: ...WITCH HIGH LIMIT COMMISSIONING THE BOILER WATER HEATER UNIT CYCLED MIN OF 15 TIMES CUSTOMER INSTRUCTED ALL COVERS REPLACED CUSTOMER GIVEN MANUAL TARGET TEMP SET PER CUSTOMER COMMISSIONED BY __________...

Страница 40: ...www rbiwaterheaters com 260 North Elm Street 7555 Tranmere Drive Westfield MA 01085 Mississauga Ontario L5S 1L4 Canada Phone 413 568 9571 Phone 905 670 5888 Fax 413 568 9613 Fax 905 670 5782...

Отзывы: