Raypak XVers 856-3006 Скачать руководство пользователя страница 6

drain is inspected and ensure that condensate is 

being directed to appropriate condensate treat-

ment system or drain, as required by local codes.

3.  Check that area is free from combustible mate-

rials, gasoline, and other flammable vapors and 

liquids.

4.  Check for and remove any obstruction to the flow 

of combustion or ventilation air to boiler.

5.  Follow pre-start-up check in the Start-up section.

6.  Check flame strength signal as noted on display. 

Remove and visually inspect hot surface igniter 

and sensor for damage, cracking or debris build-

up.

7.  Check operation of safety devices. Refer to manu-

facturers’ instructions.

8.  Follow oil-lubricating instructions on pump (if 

re-quired). Over-oiling will damage pump. Water-

lubricated circulators do not need oiling.

9.  To avoid potential of severe burn, DO NOT REST 

HANDS ON OR GRASP PIPES. Use a light touch; 

return piping will heat up quickly.

10. Check blower and blower motor

11.  Check for piping leaks around pumps, relief valves 

and other fittings. Repair, if found. DO NOT use 

petroleum-based stop-leak.

Periodically

1.  Check relief valve. Refer to manufacturer’s instruc-

tions on valve.

2.  Test low water cut-off (if equipped). Refer to man-

ufacturer’s instructions.

Preventive Maintenance

Schedule

The following procedures are recommended and are 

good practice for all XVers installations.

Daily

1.  Check gauges, monitors and indicators.

2. Check instrument and equipment settings. 

 

(See “Post Start-Up Check” in the I&O Manual.)

MAINTENANCE

Suggested Minimum

Maintenance Schedule

Regular service by a qualified service agency and 

maintenance must be performed to ensure maximum 

operating efficiency.

Maintenance as outlined below may be performed by 
the owner.

Daily

1.  Check that the area where the boiler is installed 

is free from combustible materials, gasoline, and 

other flammable vapors and liquids.

2.  Check for and remove any obstruction to the flow 

of combustion or ventilation air to boiler.

Monthly

1.  Check for piping leaks around pumps, mixing 

valves, relief valves, and other fittings. If found, 

repair at once. DO NOT use petroleum-based 

stop-leak compounds.

2.  Visually inspect venting system for proper func-

tion, deterioration or leakage.

3.  Visually inspect for proper operation of the con-

densate drains in the venting, and the internal 

condensate trap. Clean trap as necessary. If leaks 

are observed, repair at once.

4.  Check air vents for leakage.

Yearly (Beginning Of Each Heating 

Season)

Schedule annual service call by qualified service 

agency.

1.  Visually check top of vent for soot. Call service 

person to clean. Some sediment at bottom of vent 

is normal.

2.  Visually inspect venting system for proper function, 

deterioration or leakage. Ensure that condensate 

Содержание XVers 856-3006

Страница 1: ...e or explosion may result causing property damage personal injury or loss of life QUE FAIRE SI VOUS SENTEZ UNE ODEUR DE GAZ Ne pas tenter d allumer d appareils Ne touchez à aucun interrupteur Ne pas vous servir des téléphones dansle bâtiment où vous vous trouvez Appelez immédiatement votre fournisseur de gaz depuis un voisin Suivez les instructions du fournisseur Si vous ne pouvez rejoindre le fou...

Страница 2: ...r water A AWARNING To minimize the possibility of improper operation serious personal injury fire or damage to the heater Always keep the area around the heater free of combustible materials gasoline and other flammable liquids and vapors Heater should never be covered or have any blockage to the flow of fresh air to the heater CAUTION This boiler requires forced water circulation when the burner ...

Страница 3: ......

Страница 4: ...E MISE EN MARCHE 1 ARRÊTEZ Lisez les instructions de sécurité sur la portion supérieure de cette étiquette 2 Réglez le thermostat à la température la plus basse 3 Coupez l alimentation électrique de l appareil 4 Cet appareil ne comporte pas de veilleuse Il est muni d un dispositif d allumage qui allume automa tique ment le brûleur Ne tentez pas d allumer le brûleur manuellement 5 Enlever le pannea...

Страница 5: ...NT OF HEATER GAS VALVE GAS TRAIN HEAT EXCHANGER T P GAUGE FLOW SWITCH GAS SUPPLY CONNECTION WATER OUTLET 3 FLANGE FLOW SENSOR WATER INLET 3 FLANGE OPTIONAL LOW GAS PRESSURE SWITCH VENT TEMP SENSOR LOW WATER PROBE HIGH GAS PRESSURE SWITCH OPTIONAL ON MODELS 0856 2506 GAS SHUTTER PIM HIGH VOLTAGE SWITCH VERSA BOARD 3 POSITION LOW VOLTAGE SWITCH TOUCHSCREEN DISPLAY LOW VOLTAGE FIELD CONNECTION AIR FI...

Страница 6: ...ing procedures are recommended and are good practice for all XVers installations Daily 1 Check gauges monitors and indicators 2 Check instrument and equipment settings See Post Start Up Check in the I O Manual MAINTENANCE Suggested Minimum Maintenance Schedule Regular service by a qualified service agency and maintenance must be performed to ensure maximum operating efficiency Maintenance as outli...

Страница 7: ...me sensor 4 Conduct a combustion test at high and low fire Carbon dioxide should be 8 6 to 9 4 at full fire for natural gas and between 9 9 to 10 7 for pro pane gas Carbon monoxide should be 100 ppm 5 Check valve coil for 60 cycle hum or buzz Check for leaks at all valve fittings using a soapy water solution while boiler is operating Test other oper ating parts of all safety shut off and control v...

Страница 8: ...www raypak com Raypak Inc 2151 Eastman Avenue Oxnard CA 93030 805 278 5300 Fax 805 278 5468 Litho in U S A ...

Отзывы: