3.7.2. 

Relief Valve Piping

A

A

WARNING:

 Pressure relief valve discharge piping must 

be piped near the floor and close to a drain to eliminate 

the potential of severe burns. Do not pipe to any area 

where freezing could occur. Refer to local codes.

3.7.3. 

Temperature & Pressure Gauge

The temperature and pressure gauge is shipped threaded 

onto the heater outlet assembly.

3.7.4.  Hydrostatic Test

Unlike many types of heaters, this heater does not require 

hydrostatic testing prior to being placed in operation. The 

heat exchanger has already been factory-tested and is 

rated for 160 psi (1100 kPa) operating pressure. However, 

Raypak does recommend hydrostatic testing of the piping 

connections to the heater and the rest of the system 

prior to operation. This is particularly true for hydronic 

systems using expensive glycol-based anti-freeze. Raypak 

recommends conducting the hydrostatic test before 

connecting gas piping or electrical supply. Leaks must 

be repaired at once to prevent damage to the heater. 

NEVER use petroleum-based stop-leak compounds. 

Isolate heater water connections from the system prior to 

performing a hydrostatic test.
To perform hydrostatic test:
1.  Connect fill water supply. Fill heater with water. 

Carefully fill the rest of the system, making sure to 

eliminate any entrapped air by using high-point 

vents. Close feed valve. Test at standard operating 

pressure for at least 24 hours.

2.  Make sure constant gauge pressure has been 

maintained throughout test.

3.  Check for leaks. Repair any that are found.

3.7.5.  System Sensor Installation 

The  System  Sensor  (S3)  is  required  for  all  piping 

configurations unless the units firing rate will be controlled 

by an external source such as our Temp Tracker MOD+ 

Hybrid sequencer. Proper placement and method of 

installation are critical for proper operation of the system. 

The sensor must be installed in a drywell in conjunction 

with heat conductive compound as shown in 

Figure 13

The drywell must be installed no more than 5 equivalent 

feet (1.52 m) of pipe/tubing downstream of the de-coupler 

and installed in such a way that ensures the sensor bulb is 

in the flow path. 

A

A

CAUTION:

 Be careful when installing the drywell not to 

over-tighten the well as this can damage the well and may 

prevent the sensor from fitting properly. 

Locating the sensor on the outside of the pipe will slow 

the unit's response and yield less accurate results. Use 

18AWG wire minimum for sensor wiring.

4 PIPE DIA

NOT TO EXCEED

12 IN. (305 mm)

5 FT. (1.5 M)

MAX

NOT TO SCALE

DRYWELL

SYSTEM 

SENSOR

THERMAL PASTE

NPT FITTING

SYSTEM

PIPING

TO BOILER

FROM BOILER

F10501

Figure 13.  System Sensor Installation

3.8.  Raypak Integral Cold 

Water Protection

XTherm heaters are equipped with an integral CWP 

system that utilizes a Variable-Speed Pump or pumps to 

inject just the right amount of water from the main system 

loop into the heater loop to maintain the optimum inlet 

temperature. This feature allows the system to achieve 

and maintain a specific inlet temperature target.

XTherm H boiler models equipped with the dual-injector 

pump system are designed to operate with heater inlet 

water  temperatures  down  to  50°F  (10°C)  continuous. 

Under start-up conditions the dual-injector system can 

operate  with  fluid  temperatures  down  to  32°F  (0°C). 

Continuous  operation  below  50°F  (10°C)  return  water 

temperature may cause operational issues for the unit 

as well as temperature control instability. XTherm WH 

models equipped with the single-injector pump system 

are constructed with materials appropriate for domestic 

hot water operating conditions. XTherm P models are 

equipped with a single-injector pump system and are 

constructed with all nonferrous materials for rust-free 

operation. Contact your local representative or the factory 

for applications assistance.
For detailed information about CWP in VERSA-equipped 

systems, see VERSA IC manual (5000.72).

A

A

CAUTION:

 Damage due to internal condensation may 

occur if the primary heat exchanger inlet temperature 

does not exceed 120°F (49°C) within 7 minutes of startup. 

Warranty claims will be denied for damage or failures 

caused by condensation.

Содержание Xtherm 1005A

Страница 1: ...esult in an explosion or fire WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch do not use any phone in your building Immediately call your gas supplier...

Страница 2: ...3 23 PVC Venting Option D 32 37 3 24 Centrotherm Polypropylene Venting Option D 33 38 4 CONTROLS 39 4 1 Ignition Control Functions 39 4 2 High Limit Manual Reset 39 4 3 High Limit Auto Reset Optional...

Страница 3: ...r flammable liquids and vapors Heater should never be covered or have any blockage to the flow of fresh air to the heater A AWARNING Risk of electrical shock More than one disconnect switch may be req...

Страница 4: ...placed in kind only per Raypak s standard warranties 2 2 Model Identification The model identification number and heater serial number are found on the rating plate located on the rear jacket panel of...

Страница 5: ...AT EXCHANGER FRONT OF HEATER VFD ALTERNATE CONSTRUCTION BURNER FLAME VIEWING PORT F10241 HIGH VOLTAGE ELECTRICAL CONNECTIONS GAS SUPPLY CONNECTION FLUE OUTLET WATER INLET 2 1 2 NPT CONDENSATE DRAIN 3...

Страница 6: ...52 C can cause instant severe burns or death from scalds Children disabled and elderly are at highest risk of being scalded See Table B Feel water before bathing or showering Temperature limiting valv...

Страница 7: ...t 24 610 mm on the right side at least 24 610 mm in front and 36 914 mm above the top of the heater is required This will allow the heater to be serviced in its installed location without movement or...

Страница 8: ...ay be removed to allow access to the touchscreen without removing the outer panel This heater must be supplied with sufficient quantities of non contaminated air to support proper combustion and equip...

Страница 9: ...ator vent outlet 6 1 83 m J Clearance to non mechanical air supply inlet to building or the combustion air inlet to any other appliance 4 1 2 m below or to side of opening 1 30 cm above opening 3 91 c...

Страница 10: ...ance with Figure 38 and Figure 39 2 Ventilation of the space occupied by the heater s is required and can be provided by an opening s for ventilation air at the highest practical point communicating w...

Страница 11: ...itional room s of sufficient volume so that the combined volume of all spaces meets the criteria for a room large in comparison NFGC The total input of all gas utilization equipment installed in the c...

Страница 12: ...vent system there shall be a permanent air supply opening s having a cross section area of not less than 1 in 2 per 7 000 BTUH 320 mm2 per kW up to and including 1 million BTUH plus 1 in 2 per 14 000...

Страница 13: ...stalled no more than 5 equivalent feet 1 52 m of pipe tubing downstream of the de coupler and installed in such a way that ensures the sensor bulb is in the flow path A ACAUTION Be careful when instal...

Страница 14: ...ion system must be installed so that the chilled medium is piped in parallel with the heater with appropriate valves to prevent the chilled medium from entering the heater System flow must exceed 115...

Страница 15: ...tes are shown for standard models Pipe size selection not to exceed 2 7 ft hd pressure drop at 70 gpm 265 lpm For High Temp Process unit utilizing a single injector pump pipe sizing to be based on the...

Страница 16: ...esystemtemperatureiscontrolledbytheSystemsensor S3 The integral boiler pump P1 runs during any call for heat The System Pump P2 runs whenever the system is enabled for heating and the outdoor air temp...

Страница 17: ...Mode 3 This mode selection is for hydronic heating systems with single or multiple boilers Maximum 4 boilers in primary secondary piping configuration with or without Outdoor Air Reset S4 with indire...

Страница 18: ...rains per gallon Medium 5 15 grains per gallon Hard 16 25 grains per gallon WH Direct DHW Configuration When the unit is ordered as a WH configuration the only application available to it is direct DH...

Страница 19: ...ALLED SENSOR CITY WATER HW SUPPLY A P1a ENABLE MODBUS MASTER VERSA PIM PIM PIM PIM CITY WATER VERSA VERSA VERSA 0 10 VDC S1a S2a S1b S1c S2c S2d P2a S1d S2b P1b P1c P1d S3 B C D FACTORY INSTALLED SENS...

Страница 20: ...tream of the heater outlet See Figure 22 for the sensor locations Wire the sensor to the S6 sensor position TB1 pins 2 and 3 For data on acceptable pool chemistry see Table L For pipe sizing see Table...

Страница 21: ...ld be obtained from your pool or spa builder accredited pool shop or chemical supplier for the correct levels for your water NOTE The allowable concentrations of salt and of the Total Dissolved Solids...

Страница 22: ...natural gas at the heater A minimum of 4 WC and a maximum of 13 WC is required for propane gas at the heater The gas pressure regulator s supplied on the heater is for low pressure service If upstream...

Страница 23: ...NEC In Canada CSA C22 1 C E C Part 1 XTherm heaters are wired for 120VAC single phase power These units come wired with separate connections for the heater and pumps These connections may be wired to...

Страница 24: ...accordance with the applicable manufacturers instructions 7 Conduit should not be used as the earth ground NOTE A grounding electrode conductor shall be used to connect the equipment grounding conduc...

Страница 25: ...EXTERNAL INTERLOCK SYSTEM SENSOR OUTDOOR SENSOR INDIRECT DHW SENSOR TEMP TO INDIRECT SENSOR JUMPER 11 12 WHEN NOT USED ENABLE DISABLE INDIRECT DHW OVERIDE FIELD WIRING TERMINAL BLOCKS FACTORY WIRING N...

Страница 26: ...control either the setpoint temperature of a single boiler or a cascade of up to 4 boilers or the firing rate of a single boiler 2 To enable this remote control function set DIP switch 5 to the UP po...

Страница 27: ...Disable wiring to terminals 11 and 12 on the field wiring strip located on the Master heater This connection must be provided through dry contacts closure See Figure 29 Applying 24VAC to these termina...

Страница 28: ...s excessive condensate production in the vent Category IV A heater which operates with a positive vent pressure and with a vent gas temperature that may cause excessive condensate production in the ve...

Страница 29: ...Vent Adapter 1005A 2SVEE0690 2SVSRTX06 6 Z vent 6 to 4 Lengths 2SVSA06 1505A 2SVEE0890 2SVSRTX08 8 Z vent 6 to 4 Lengths 2SVSA08 2005A NOTE The XTherm heater is supplied with a vent connector that MAY...

Страница 30: ...ick or masonry surfaces 12 DO NOT extend exposed vent pipe outside of building beyond the minimum distance required for the vent termination Condensate could freeze and block vent pipe 3 15 1 U S Inst...

Страница 31: ...2 Within 6 1 8 m of a mechanical air supply inlet to any building 3 Aboveameter regulatorassemblywithin3 915mm horizontally of the vertical centre line of the regulator 4 Within 6 1 8 m of any gas ser...

Страница 32: ...e drain in a vent tee however this can also be accomplished using an inline collector for condensing stacks or an inline vertical or horizontal collector available from several of the listed vent manu...

Страница 33: ...1 The vent must be installed with a condensate drain located in proximity to the heater as directed by the vent manufacturer 2 The vent must be installed with a slight upward slope of not less than 1...

Страница 34: ...must be taken during assembly that all joints are sealed properly and are airtight The vent must be installed to prevent the potential ac cumulation of condensate in the vent pipes It is required tha...

Страница 35: ...oors and must use the outdoor vent cap available from the manufacturer sales order option D 11 2 Periodically check venting system The heater s venting areas must never be obstructed in any way and mi...

Страница 36: ...sate Treatment kit Sales order option Z 12 The Treatmentkitisconnectedtothecondensatedrainsystem and contains treatment media to raise the pH level of the condensate The kit should be added to avoid d...

Страница 37: ...y a thin coat of cement to fitting avoiding puddling inside 6 Apply a liberal coat of cement to pipe leaving no voids 7 QUICKLY assemble parts while cement is fluid If you wait too long re coat pipes...

Страница 38: ...il debris or damage Installation Vent pipes are joined by push fit connections with EPDM gaskets located in the sockets Pipes and components must be installed with the socket ends to the outlet and ma...

Страница 39: ...ury or death A ACAUTION This appliance has provisions to be connected to more than one supply source To reduce the risk of electric shock disconnect all such connections before servicing A ACAUTION Ri...

Страница 40: ...re switch sales option S 1 mounts upstream of the gas valve on the inlet flange to the gas valve and is accessible through the removable access panels on the side or front of the heater to reset the g...

Страница 41: ...been applied Minimum setpoint is 50 F 10 C maximum is 220 F 104 C for H models 150 F 66 C for WH models and 104 F 40 C for P models The default setpoint is 180 F 82 C for H models 125 F 52 C for WH m...

Страница 42: ...target indirect DHW tank temperature requires IND Sensor ON 6 F 4 C IND SUPPLY H MODE 2 3 OFF 50 F 10 C to PIM value Target boiler temperature for the DHW heat exchanger during indirect DHW operation...

Страница 43: ...ected LIMIT TEMP ALL Current Outlet Limit temperature EMS Vdc ALL Current EMS signal in Volts DC FIRE RATE ALL PIM firing rate SPEED ALL Blower speed in revolutions per minute rpm OUTLET MAX H Mode 1...

Страница 44: ...O All Records the lowest boiler outlet temperature Press UP DOWN for 1 sec to clear DELTA T All Captures the highest Delta T Temperature recorded Press UP DOWN buttons for 3 sec to clear this entry OU...

Страница 45: ...the heating water is controlled by the Reset Ratio Water Offset and changes with the outdoor temperature Reset Ratio Outdoor Reset When a building is being heated heat escapes through the walls doors...

Страница 46: ...ired to heat the heater zones when the outdoor air is as cold as the OUT DESIGN temperature Warm Weather Shut Down WWSD When the outdoor air temperature rises above the WWSD setting the control turns...

Страница 47: ...47 RELEASED RELEASED For Reference Only For Reference Only For a full size drawing visit www raypak com commercial wiring_diagrams 5 WIRING DIAGRAM FOR MODELS 1005A 2005A...

Страница 48: ...do not use any telephone in your building Immediately call your gas supplier from a neighbor s telephone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire depa...

Страница 49: ...ignition module it will go into lockout 5 Wait until the controller indicates 100 on the firing rate display screen approximately 30 seconds 6 5 1 Blower Check 1 Check blower suction using the manomet...

Страница 50: ...lowingsafetychecksleavemanometers hooked up check and record 3 If other gas fired appliances in the room are on the same gas main check all pressures on the XTherm with all other equipment running 4 C...

Страница 51: ...to normal operation by turning DIP switch 8 back to the OFF position Power to the unit must then be cycled off then on to return to normal operation 8 Test ignition system safety device a Close manual...

Страница 52: ...scond trial for ignition System will try for ignition up to three times one time on optional single try ignition module If flame is not sensed lockout will commence 8 If the appliance will not operat...

Страница 53: ...t hot The electrical power is off A ACAUTION Wiring errors can cause improper and dangerous operation Verify proper operation after servicing See wiring diagram A ACAUTION If overheating occurs or the...

Страница 54: ...i Limit Fault Red LED 7 Flashes Check for proper water flow Check hi limit setting and outlet sensor Sensor Fault Red LED 8 Flashes Check the VERSA IC Control for fault identification Check sensor and...

Страница 55: ...top of vent for soot Call service person to clean Some sediment at bottom of vent is normal 2 Visually inspect venting system for proper function deterioration or leakage Ensure that condensate drain...

Страница 56: ...ilter and replace as necessary 9 2 5 Annually 1 Test flame failure detection system and pilot turndown 2 Test high limit and operating temperature See Post Start Up Check on page 51 3 Check flame sens...

Страница 57: ...eel which is commonly used in high efficiency systems The heater can be supplied with corrosion resistant non metallic intake air vent material You may however choose to use outside combustion air for...

Страница 58: ...rmination is less than seven 7 feet above finished grade in the area of the venting including but not limited to decks and porches the following requirements shall be satisfied 1 INSTALLATION OF CARBO...

Страница 59: ...n Analyzer O2 _____________ _____________ See manual CO _____________PPM _____________PPM Less than 100 PPM CO2 _____________ _____________ See manual Model Number ______________________________ Note...

Страница 60: ...86 8 1 27 55 287 7 5 9 8 72 4 5 8 899 1 A 1 70 2 1 87C 8 2 87 B 1 6 5 18 4 7 B 7 B 2 B 86 8 1 27 55 287 0 27 F 1 6 5 18 4G A 5 18 2 B 1 89 287 5 0 1 70 A 270 E 7 1 69 27 4 7 1 69 8 89 270 1 69 A 270...

Страница 61: ...55 6 1 7 78 2 B 12 B9 4 2 2 8 8 27 287 0 270 1 5 26 2 1 2 78 25 5 87 2 7 0 B9 4 7 6 7 7 A7 8 55 7 55 9 89 18 2C 287 6 2 2 86 B9 4 8 95 6 7 8 7B 9 12 2 1 875B 7 B 02 7 B B9 4 8 87 2 18 2C 8 6 4 7B 8 1...

Страница 62: ...62...

Страница 63: ...63...

Страница 64: ...www raypak com Raypak Inc 2151 Eastman Avenue Oxnard CA 93030 805 278 5300 Fax 805 278 5468 Litho in U S A...

Отзывы: