background image

56

LIMITED PARTS WARRANTY

ADVANCED DESIGN BOILER™

SCOPE:

Raypak, Inc. ("Raypak") warrants to the original owner that all parts of this boiler which are actually manufactured by Raypak
will be free from failure under normal use and service for the specified warranty periods and subject to the conditions set forth
in this Warranty. Labor charges and other costs for parts removal or reinstallation, shipping and transportation are not cov-
ered by this Warranty but are the owner's responsibility.

HEAT EXCHANGER WARRANTY:

° Ten (10) Years from date of boiler installation. This includes only cupro-nickel with bronze or cast iron waterways.
° Twenty (20) Years from date of boiler installation against "Thermal Shock" (excluded, however, if caused by boiler opera-
tion at large changes exceeding 150°F between the water temperature at intake and boiler temperature, or operating at boiler
temperatures exceeding 230°F).

BLUFF HEAD BODY BURNER WARRANTY:

° Ten (10) Years from date of boiler installation.

ANY OTHER PART MANUFACTURED BY RAYPAK:

One (1) Year warranty from date of boiler installation, or eighteen (18) months from date of factory shipment based on
Raypak's records, whichever comes first.
SATISFACTORY PROOF OF INSTALLATION DATE, SUCH AS INSTALLER INVOICE, IS REQUIRED. THIS WARRANTY
WILL BE VOID IF THE BOILER RATING PLATE IS ALTERED OR REMOVED.

ADDITIONAL WARRANTY EXCLUSIONS:

This warranty does not cover failures or malfunctions resulting from:
1. Failure to properly install, operate or maintain the boiler in accordance with our printed instructions provided;
2. Abuse, alteration, accident, fire, flood and the like;
3. Sediment or lime buildup, freezing, or other conditions causing inadequate water circulation;
4. High velocity flow exceeding boiler design rates;
5. Failure of connected systems devices, such as pump or controller;
6. Use of non-factory authorized accessories or other components in conjunction with the boiler system;
7. Failing to eliminate air from, or replenish water in, the connected water system;
8. Chemical, particulate matter or other airborne contamination of combustion air or use of chemical additives to water.

PARTS REPLACEMENT:

Under this Warranty, Raypak will furnish a replacement for any failed part. The failed part must first be returned to Raypak if
requested, with transportation charges prepaid, and all applicable warranty conditions found satisfied. The replacement part
will be warranted for only the unexpired portion of the original warranty. Raypak makes no warranty whatsoever on parts not
manufactured by it, but Raypak will apply any such warranty as may be provided to it by the parts manufacturer.

TO MAKE WARRANTY CLAIM:

Promptly notify the original installer, supplying the model and serial numbers of the unit, date of installation and description
of the problem. The installer must then notify his Raypak distributor for instructions regarding the claim. If either is not avail-
able, contact Service Manager, Raypak, Inc., 2151 Eastman Avenue, Oxnard, CA 93030 or call (805) 278-5300. In all cases
proper authorization must first be received from Raypak before replacement of any part.

EXCLUSIVE WARRANTY - LIMITATION OF LIABILITY:

This is the only warranty given by Raypak. No one is authorized to make any other warranties on Raypak's behalf. THIS
WARRANTY IN LIEU OF ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO
IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. RAYPAK'S SOLE LIA-
BILITY AND THE SOLE REMEDY AGAINST RAYPAK WITH RESPECT TO DEFECTIVE PARTS SHALL BE AS PROVIDED
IN THIS WARRANTY. IT IS AGREED THAT RAYPAK SHALL HAVE NO LIABILITY, WHETHER UNDER THIS WARRANTY,
OR IN CONTRACT, TORT, NEGLIGENCE OR OTHERWISE, FOR ANY SPECIAL, CONSEQUENTIAL, OR INCIDENTAL
DAMAGE, INCLUDING DAMAGE FROM WATER LEAKAGE. Some states do not allow limitations on how long an implied
warranty lasts, or for the exclusion of incidental or consequential damages. So the above limitation or exclusion may not
apply to you.

This Limited Warranty gives you specific legal rights. You may also have other rights which may vary from state to state. We
suggest that you complete the information below and retain this certificate in the event warranty service is needed.
Reasonable proof of the effective date of the warranty (date of installation) must be presented, otherwise, the effective date
will be based on the date of manufacture plus thirty (30) days.

Содержание 751

Страница 1: ...r any other appliance To do so may result in an explosion or fire WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch do not use any phone in your building...

Страница 2: ...2...

Страница 3: ...bustion Air Supply 11 Water Piping 12 Hydronic Heating 13 Gas Supply Connections 21 Electrical Power Connections 23 Venting Connections 25 Venting Installation Tips 27 Venting Configurations 27 Conden...

Страница 4: ...pect the heater and to replace any part of the control system and any gas control which has been under water WARNING To minimize the possibility of improper operation serious personal injury fire or d...

Страница 5: ...ication number and heater serial number are found on the heater rating plate located on the left inside jacket of the heater The model number will have the form H4 0751A ADB or similar depending on th...

Страница 6: ...6 Component Locations Fig 1 Component Locations...

Страница 7: ...thermostatically controlled mixing valve for reducing point of use water temperature is recommended to reduce the risk of scald injury Contact a licensed plumber or the local plumbing authority for f...

Страница 8: ...d For Canada only CAN CSA B149 Installation Code and CSA C22 1 C E C Part 1 C22 1 The temperature of the water in the hot water boiler can be regulated by setting the temperature dial on front of the...

Страница 9: ...of all equipment in the room when the opening is communicating directly with the outdoors or through vertical duct s The total cross sectional area shall be at least one 1 square inch of free area per...

Страница 10: ...e 4 ft 1 2m below or to side of opening 1 ft 30 cm above opening 3 ft 91 cm K Clearance to mechanical air supply inlet 3 ft 91 cm above if within 10 ft 3m horizontally 6 ft 1 83m L Clearance above pav...

Страница 11: ...The minimum free area required for horizontal ducts is one 1 square inch per 2 000 BTUH of total input rating to all the equipment in the room 4 Refer to NFGC Part 5 for additional information Refer t...

Страница 12: ...any other types of boilers Raypak boilers do not require hydrostatic testing prior to being placed in operation The heat exchanger has already been fac tory tested and is rated for 160 PSI operating p...

Страница 13: ...is piped in parallel with the boiler with appropriate valves to prevent the chilled medium from entering the boiler 13 The boiler piping system of a hot water heating boiler connected to heating coils...

Страница 14: ...14 Fig 4 Single Boiler Primary Secondary Piping Fig 5 Single Boiler Primary Secondary Piping with CHX...

Страница 15: ...15 Fig 6 Dual Boiler Piping Fig 7 Dual Boiler Piping with CHX...

Страница 16: ...piping system for domestic water applications water hardness should be consid ered Table F indicates the suggested flow rates for Table F Domestic Water Heating Boiler Flow Rate Requirements T Tempera...

Страница 17: ...17 Fig 9 Single Boiler Domestic Hot Water with One Storage Tank Fig 10 Single Boiler Domestic Hot Water with One Storage Tank and CHX...

Страница 18: ...18 Fig 11 Single Boiler Domestic Hot Water with One Storage Tank and CHX 2 pump system Fig 12 Single Boiler Domestic Hot Water with One Storage Tank One Pre Heat Tank and CHX...

Страница 19: ...G Flow Rates Loop is secondary piping to heater from main system CAUTION ADB bypass piping should be copper and or CPVC PVC piping should NOT be used Automatic Chlorinators and Chemical Feeders All c...

Страница 20: ...20 Fig 13 Single Boiler Pool Application Fig 14 Single Boiler Pool Application with CHX...

Страница 21: ...to inches regulator must be installed to reduce to gas supply pressure to under 14 in WC The regulator should be placed a minimum distance of 10 times the pipe diam eter upstream of the boiler gas con...

Страница 22: ...pressure exceeds 14 in WC an intermediate gas pressure reg ulator of the dead lockup type must be installed When connecting additional gas utilization equipment to the gas piping system the existing p...

Страница 23: ...oper voltage to the boiler and pump Install a separate disconnect means for each load Use appropriate sized wire as defined by NEC CSA and or local code All primary wiring should be 125 of minimum rat...

Страница 24: ...ions Domestic Hot Water The ADB is wired for 120 VAC The voltage is indicat ed on the tie in leads Consult the wiring diagram shipped with the boiler in the instruction packet The TH leads are for the...

Страница 25: ...or vent category requirements for the Advanced Design Boiler CAUTION Proper installation of flue exhaust venting is critical for the safe and efficient operation of the boiler For vent systems not sho...

Страница 26: ...operation of regulators relief valves or other equipment Where local experience indi cates that condensate is a problem with Category I and III appliances this provision shall also apply f Locate and...

Страница 27: ...braces under or near elbows Follow items listed below to avoid personal injury or property damage Cut nonmetallic vent pipe with fine toothed hacksaw 34 teeth per inch Do not use nonmetallic vent pipe...

Страница 28: ...er Category I NOTE Rear venting is recommended to minimize interference with water piping Vent lengths are based on a lateral length of 2 feet Refer to the latest edition of the National Fuel Gas Code...

Страница 29: ...ectric meters gas meters regulators and relief equipment The distance of the vent terminal from adjacent public walkways adjacent buildings open windows and building openings must be consistent with t...

Страница 30: ...eturn doors windows exhaust fans fireplace dampers and other gas burning appliances to their previous conditions of use g Any improper operation of the common venting system should be corrected so tha...

Страница 31: ...st be installed to prevent the potential accumulation of condensate in the vent pipes It is rec ommended that a The vent be installed with a slight downward slope of not more than 1 4 per foot of hori...

Страница 32: ...ting system Care must be taken during assembly that all joints are sealed properly and are airtight The vent must be installed to prevent the potential accumulation of condensate in the vent pipes It...

Страница 33: ...of snow ice leaves debris etc The Stainless Steel direct vent cap must be fur nished by the boiler manufacturer in accordance with its listing WARNING For common vent installations call factory WARNIN...

Страница 34: ...foot from the boiler to the vent terminal The horizontal portions of the vent shall also be sup ported for the design and weight of the material employed to maintain clearances and to prevent phys ica...

Страница 35: ...rdance with the National Fuel Gas Code or in Canada the latest edi tion of CSA B149 Installation Code for Gas Burning Appliances and Equipment UL 1738 Certified Venting Material e g AL29 4C MUST be us...

Страница 36: ...room in accordance with the National Fuel Gas Code or in Canada the latest edi tion of CSA B149 Installation Code for Gas Burning Appliances and Equipment UL 1738 Certified Venting Material e g AL29...

Страница 37: ...ss Steel PVC CPVC 10 35 Subtract 10 ft per elbow Max 3 elbows Galvanized Steel PVC ABS CPVC 6 35 Subtract 10 ft per elbow Max 3 elbows ADB 1501 w CHX IV UL 1738 Certified Venting Material e g AL29 4C...

Страница 38: ...heat tank PVC or CPVC may be used Contact manufacturer for details To prevent condensate accumulation in the vent it is required to install the horizontal portion of vent with a slight upward slope o...

Страница 39: ...required to install the horizontal portion of vent with a slight upward slope of not more than 1 4 per foot of horizontal run and an approved condensate trap must be installed per applicable codes The...

Страница 40: ...mounted directly on the vent pipe of the boiler NOTE Condensate can freeze on the vent cap Frozen condensate on the vent cap can result in a blocked flue condition CONDENSATE DRAIN The Condensing Hea...

Страница 41: ...service agency Failure to do so may result in control damage boiler malfunction property damage personal injury or death WARNING Turn off the power to the boiler before installation adjustment or serv...

Страница 42: ...eriod prior to pilot trial for ignition The pre purge peri od ensures that the combustion chamber is clear of all excess combustible gases prior to commencing the pilot ignition cycle The pre purge de...

Страница 43: ...U 2 board will illu minate the corresponding LED lamp will shut down the boiler and will light the flashing red LED Service lamp on the CPW board If more than one fault is detected the U 2 board will...

Страница 44: ...44 Figure L 2 WIRING DIAGRAM WIRING DIAGRAM...

Страница 45: ...the device is powered and pre purged Unit per forms its own safety check and opens the main valve only after the pilot is proven to be lit High Limit Manual Reset This appliance is equipped with a man...

Страница 46: ...vents one at a time until water squirts out Close vent 6 Repeat with remaining vents 7 Close manual water feed valve when correct boil er pressure is reached Inspect Venting System 1 Check all vent p...

Страница 47: ...ol system and any gas control which has been under water Pre Start up Check 1 Verify boiler is filled with water 2 Check system piping for leaks If found repair immediately 3 Vent air from system Repe...

Страница 48: ...ear the gas out of the boiler room before continuing Check the Gas Supply Pressure Location 1 Leave pilot gas valve and first manual gas valve closed Slowly turn on main gas shut off valve outside the...

Страница 49: ...You will hear a click from pilot gas valve you will not hear the spark ing 8 The pilot may not light at first trial leave the unit running until you have pilot If you still do not see pilot over 90 se...

Страница 50: ...ome ters and analyzer hooked up check and record If other gas fired equipment in the room and on same gas main check gas pressures on ADB with them running Remember supply gas should always be between...

Страница 51: ...t to the lowest setting 3 Turn off all electric power to the appliance 4 This appliance is equipped with an ignition device which automatically lights the burner DO NOT try to light the burner by hand...

Страница 52: ...Check the hose fitting orifice on the blower Make certain that orifice is not blocked by grease dirt or any other debris If necessary use a thin wire to clean up the orifice Periodically 1 Check reli...

Страница 53: ...boiler with a CHX attached to it the vent switch must be adjusted to proper setting The vent switch is located on the J box just outside the ignition module Use the following steps Turn power off disc...

Страница 54: ...metallic vent pipe In extremely contaminated area this may also experience deterioration Products causing contaminated combustion air spray cans containing chloro fluorocarbons permanent wave solution...

Страница 55: ...Stack Height _______ Low Water Cutoff _______________Test Category _________ sketch vent on reverse side Number of Tanks and Size Qty____ _______Gallons Vent Material __________________ Plumbing Size...

Страница 56: ...additives to water PARTS REPLACEMENT Under this Warranty Raypak will furnish a replacement for any failed part The failed part must first be returned to Raypak if requested with transportation charges...

Страница 57: ...raypak com Raypak Inc 2151 Eastman Avenue Oxnard CA 93030 805 278 5300 FAX 800 872 9725 Raypak Canada LTD 2805 Slough Street Mississauga Ontario Canada L4T 1G2 905 677 7999 FAX 905 677 8036 Litho in U...

Отзывы: