27
Operation
On call for heat, the ignition system, consisting of an
electronic spark module, gas pilot system is energized.
Providing pilot is proven blower will start running, the
main gas valve will open and the heater will operate.
When the operating control is satisfied the heater will
shut down.
Start-up Procedures (S8610B)
1.
Turn on power to the heater with gas supply off.
2.
Check ignition module as follows:
a. Set the thermostat or controller to call for heat.
b. Watch for continuous spark at the pilot burner.
c. Check the ignition spark operation. Time must
be within the lockout timing period (15 or 90
seconds).
d. Turn control down to end call for heat and wait
60 seconds on lockout models before begin-
ning step 3.
3.
Turn on gas supply.
4.
Set controller to call for heat.
5.
System should start as follows:
a. Spark will turn on and pilot gas valve will open
and the blower will begin running.
b.
Heater will operate until call for heat is satis-
fied.
Burner Adjustment
This burner assembly does not require any adjust-
ments.
Visual Inspection
Flame can be observed through the slot opening
above the plenum. Flame color is blue and evenly
spread on the top surface of the burner. At least every
three months a visual inspection should be made of
the burners. In case flame lifting is observed on the
burner, check gas pressure on manifold and static
pressure in plenum. Gas pressure in manifold should
be 3.9 in. WC and static pressure in plenum should be
greater than 0.5 in. WC.
Electrical
Be sure that electrical service to the heater has over-
load fuse or circuit breaker protection, wire size and
connections that comply with all applicable codes.
High/Low Gas Pressure Switch
Pressure switch senses high/low pressure and auto-
matically shuts down burner if abnormal pressure
exists.
Burner Drawer Removal
1. Shut off main electrical power switch to heater.
2. Shut off gas upstream of heater.
3. Remove front door.
4. Disconnect gas line from gas valve.
5. Remove (2) screws that mount burner tray to unit,
and (4) screws that secure gas valve to jacket.
6. Disconnect wires that terminate at gas valve.
7. Unscrew (4) screws that secure the control box.
8. Disconnect pilot wire from the ignition module.
9. Disconnect wire harness from the combustion
blower.
Fig. 30: Gas Pressure Switch
Fig. 31: Low NOx Burner Tray Assembly
Содержание 2600401
Страница 17: ...17 Wiring Diagrams Fig 15 Standing Pilot Model 0260 FIELD INSTALLED...
Страница 18: ...18 Fig 16 Intermittent Ignition Device IID Model 0260...
Страница 19: ...19 Fig 17 Intermittent Ignition Device IID Models 0330 0400...
Страница 20: ...20 Fig 18 Intermittent Ignition Device IID Model 0261 Low NOx...
Страница 21: ...21 Fig 19 Intermittent Ignition Device IID Models 0331 0401 Low NOx...
Страница 37: ...37...
Страница 38: ...38...
Страница 39: ...39...
Страница 40: ...www raypak com Raypak Inc 2151 Eastman Avenue Oxnard CA 93030 805 278 5300 Fax 805 278 5468 Litho in U S A...