CLEARANCES
TABLE 1
INDOOR INSTALLATION
MINIMUM CLEARANCES FROM COMBUSTIBLE SURFACES
Models
Heater Side
122-322
Floor
See Note 1
Rear
1"
Water Side
12”
Other Side
1"
Top
1"
Vent
2"
Note 1
. Do not install on carpeting.
When installed according to the listed minimum clearances from combustible construction materials, the
Raypak heaters can still be serviced without removing permanent structural construction around the heater.
However, for ease of servicing, we recommend a clearance of at least 24” in front, and at least 18” on the
water connection side. This will enable the heater to be serviced in its installed location, that is, without
movement or removal of the heater.
Clearances less than minimum, may require removal of the heater to service either the heat exchanger or the
burner tray. In either case, the heater must be installed in a manner that will enable the heater to be serviced
without removing any structure around the heater.
9
TOP VIEW
FRONT VIEW
Содержание 122-322
Страница 6: ...HI DELTA COMPONENT LOCATION 6 BACK LEFT SIDE FRONT See detail page 7 See detail page 7 ...
Страница 7: ...7 General Information GasValve Detail Air Shutter Adjustment ...
Страница 15: ...SINGLEBOILER LOWTEMPERATUREAPPLICATION HEATPUMP PRIMARY SECONDARYPIPING DUALBOILERPRIMARY SECONDARYPIPING 15 ...
Страница 17: ...17 SINGLE HEATER DOMESTIC HOTWATER WITH ONE STORAGE TANK ...
Страница 33: ...DIRECT VENT Horizontal Thru wall Venting Category III HORIZONTALTHRU WALLVENTINGTABLE 33 SECTION J 3 ...
Страница 35: ...DIRECT VENT Vertical Venting Category I VERTICALVENTINGTABLE 35 SECTION J 4 ...
Страница 41: ...41 WIRE DIAGRAM MODELS 122 322 Reference Drawing Number M152564C ...
Страница 50: ...Fig 241093 50 ...
Страница 51: ...51 HEATEXCHANGERDETAIL ...
Страница 52: ...52 ...
Страница 53: ...53 ...
Страница 54: ......