background image

5973132-5

SIDEROOM REQUIRED
           20" TO 26"

OPERATOR MOUNTING PAD

FIG. 2

FIG. 3

HEADROOM

TORSION SPRING

SHAFT

CHAIN SPROCKET

14"

20"

12"

8"

MUST BE

PARALLEL

TORSION SPRING

SHAFT

DRIVE CHAIN

FIG. 4

DISCONNECT CHAIN

SPRING TO BE

STRETCHED APPROX.

2" TO ENSURE BRAKE

DISENGAGEMENT

1. To operate door manually, pull both disconnect

   chains and lock off in bracket. This will
   release the brake and engage the chain hoist.

2. Disconnect the hand chain from its bracket

   and pull on hand chain to raise the door. Use
   caution to ensure you are pulling the correct
   direction.

3. Raise door approximately one foot and release

   the hand chain. The door should stay in this
   position. If it does not, there may be a problem
   with the door. Do not operate it manually.
   Contact your local Raynor Distributor for repair.

4. To return to electrical operation, disengage

   disconnect chains and lock hand chain into
   bracket.

INSTALL MOUNTING PAD

Begin installation by locating operator mounting pad in
position shown (See Fig. 2). Use steel plate or heavy
wood securely fastened to wall or framework.

HANGING OPERATOR

During installation, keep in mind that it is best to have
both the driving sprocket on the operator, and the driven
sprocket on the door shaft, as close as possible to the
bearings that hold the shafts in place. Assemble large,
driven sprocket to door shaft as shown in Fig. 3 using
the key provided in hardware package and tighten set
screw. If door shafting is tubing, it should be plugged
with 3/4" dia. solid bar for best results.

Place small drive sprocket on proper side of operator shaft as
shown in Fig. 3. Remove base mounting plate from operator
(see Fig. 3) and use as a template for drilling holes in wall, then
re-install base mounting plate to operator. Lift operator into place,
raising it so that the mounting bolts are against the bottom of the
slots in the base angle to allow for maximum chain adjustment.
Snug bolts enough to hold operator in place. The small drive
sprocket will need to be aligned with large driven sprocket. Loosen
set screw and move small sprocket along shaft to align vertically
with large sprocket on door shaft. See Fig. 3. Place chain over
door sprocket and operator sprocket. If chain is too long, remove
required number of links and reassemble. Loosen mounting bolts
and lower the operator to take up slack in chain. Be sure operator
drive shaft is level and tighten mounting bolts. To prevent operator
from moving out of position, install two bolts in horizontal
slots of base angle. At this point, check all bolts and set screws for
tightness.

INSTALL DISCONNECT BRACKET

The operators are furnished with floor operated disconnect
mechanisms to allow manual operation of door in an emergency.
A wall mounted bracket is supplied with each operator to lock
the disconnect chain in position while manually raising or lowering
door. A length of chain with an extension spring is provided for
use on standard side mounted units (position 1 and 5). Mount
the bracket directly below the operator and thread the chain
through slot in bracket. Best results are obtained when the
cable travels a minimum distance in a straight line.

BASE

MOUNTING 

PLATE

DRIVEN

SPROCKET

DRIVE

SPROCKET

Содержание COH

Страница 1: ...Chain Hoist Special Application Jackshaft IMPORTANT PLEASE READ THESE INSTRUCTIONS BEFORE STARTING INSTALLATION IT IS IMPORTANT THAT THIS OPERATOR BE INSTALLED CORRECTLY IN ORDER TO ACHIEVE SAFE AND...

Страница 2: ...y of the consumer and must be performed by an authorized Raynor Dealer This warranty extends only to the original purchaser This warranty is not transferable Raynor shall not be liable for any consequ...

Страница 3: ...s 9 Do not place hands in area of pulleys V belt sprockets chain or rotating shafts 10 Install warning placard on wall next to push button 11 Attach instruction booklet to wall near push button 12 Do...

Страница 4: ...ining the operator itself one drive and one driven sprocket one length of chain one control station and one package of small hardware Unpack carton being certain that all loose parts are removed befor...

Страница 5: ...est results Place small drive sprocket on proper side of operator shaft as shown in Fig 3 Remove base mounting plate from operator see Fig 3 and use as a template for drilling holes in wall then re in...

Страница 6: ...ator and set limit switches in this mode Once correct rotation has been established manually lower door to fully closed position Set close limit nut at desired position by depressing limit nut keeper...

Страница 7: ...ten the belleville springs See Fig 6 If additional tension is required add extra belleville springs to clutch assembly WARNING Do NOT over tension clutch Note The clutch is set loose at the factory an...

Страница 8: ...Power Connection Terminal Block 1 Terminal Block 2 High Voltage Wire Harness Connection LIGHT CCM NO1 SER C1NC1 NO2 C2NC2 ON OFF OPEN CLOSE ON OFF 24VDC 24VDC 24VAC 24VAC Terminal Block 3 24V DC Power...

Страница 9: ...sing RD or RC wiring photo eye s or edge must be selected even though they are not required Note The photo eye or an electric edge must be monitored 5 SENSOR 2 TYPE will display there are three option...

Страница 10: ...warning light is required select OFF If a warning light is required select ON Press the stop button to continue 16 If a warning light is ON WARNING TIME will display The time is set in 1 second inter...

Страница 11: ...r death 8 SAVE THESE INSTRUCTIONS OPERATING INSTRUCTIONS Operating the 3 Button Control Station 1 Press OPEN button The door should move in the open direction 2 Press STOP button The door should stop...

Страница 12: ...eset press reset button on outside of control box When overload trips it cuts power to the 24 volt control circuit only To reset open control box cover and press red reset button PERIODIC INSPECTION A...

Страница 13: ...ng Off Stop button pressed or NOT connected On Open button sending signal pressed Off Open button is not sending signal 2 Open D12 6 I Lock D24 7 I Lock D23 On Chain hoist interlock circuit is open ch...

Страница 14: ...ton to pause this countdown Sensor 1 activated This message will display anytime the board is not receiving a signal from the sensor 1 when close button is pressed Whether it is not connected activate...

Страница 15: ...minate stress on rollers and cables 1 Sunlight is blocking the receiving photo eye 2 Faulty photo eyes 1 Connect Operator to power source 2 Check voltage at L1 L2 for single phase and at L1 L2 L3 for...

Страница 16: ...oard Verify power consumption of the device s before installing You may have to power the device from an external power source using only the contacts of the device to activate the operator 3 The comm...

Страница 17: ...use the dry contacts of that relay to activate the device If more than 3 amps of power is being consumed through the auxiliary board then damage to the board may occur 2 There is a 14 pin connector o...

Страница 18: ...nger anger La Label el Door oor Safet Safety y La Label el Spring Spring Warning ning Tag ag Pu Push Button h Button Placa Placard Locate n Locate near Push Button Push Button Door oor Safet Safety y...