iv
SmartPilot Verado Installation and Commissioning Guide
• More than 7 ft (2 m) from the path of a radar beam. A radar beam can normally be
assumed to spread 20 degrees above and below the radiating element.
• The equipment is supplied from a separate battery from that used for engine start. Volt-
age drops below 10 V, and starter motor transients, can cause the equipment to reset. This
will not damage the equipment, but may cause the loss of some information and may
change the operating mode.
• Raymarine specified cables are used. Cutting and rejoining these cables can compromise
EMC performance and must be avoided unless doing so is detailed in the installation
manual.
• If a suppression ferrite is attached to a cable, this ferrite should not be removed. If the fer-
rite needs to be removed during installation it must be reassembled in the same position.
EMC suppression ferrites
The following illustration shows typical cable suppression ferrites used with Raymarine
equipment. Always use the ferrites supplied by Raymarine.
Connection to other equipment
If your Raymarine equipment is to be connected to other equipment using a cable not
supplied by Raymarine, a suppression ferrite MUST always be attached to the cable near to
the Raymarine unit.
Waste Electrical and Electronic (WEEE) Directive
The WEEE Directive requires the recycling of waste electrical and electronic
equipment. Whilst the WEEE Directive does not apply to some of Raymarine’s
products, we support its requirements as par t of our environmental policy and we
as you to be aware of how you should dispose of this product. The crossed out
wheelie bin symbol found on our products signifies that it should not be disposed of in general
waste or landfill. Please contact your local dealer, national distributor or Raymarine Technical
Services for information on product disposal.
D3548-6
Содержание SmartPilot Verado
Страница 1: ...SmartPilot Verado Installation and Commissioning Guide Document Number 87057 1 Date October 2005 ...
Страница 8: ...vi SmartPilot Verado Installation and Commissioning Guide ...
Страница 10: ...viii SmartPilot Verado Installation and Commissioning Guide ...
Страница 24: ...14 SmartPilot Verado Installation and Commissioning Guide This page is intentionally blank ...
Страница 31: ...SmartPilot Verado Installation and Commissioning Guide 21 Course computer Securing the cables D8553 1 ...
Страница 66: ...56 SmartPilot Verado Installation and Commissioning Guide ...