6.1 Initial power on test
Once your product is fully connected and installed,
perform an initial power on test to verify correct
operation.
1. Switch on the vessel’s power supply.
2. Switch on the vessel’s engine(s).
The engine(s) has to be on and providing power
to its CAN bus in order for both LEDs to function.
3. Look at the diagnostics LEDs.
• During power up the LEDs will be illuminated
red (power up usually takes approximately 6
seconds).
• During normal operation the LED should flash
green once every 15 seconds.
4. If the LED flashes in a different sequence, refer
to the LED Diagnostics section for details.
34
ECI–100
Содержание eci-100
Страница 2: ......
Страница 4: ......
Страница 6: ...6 ECI 100 ...
Страница 12: ...12 ECI 100 ...
Страница 20: ...3 11 Product dimensions 109 2 mm 4 3 in 30 2 mm 1 19 in 21 35 mm 0 84 in 100 mm 3 94 in D12972 1 20 ECI 100 ...
Страница 31: ...Chapter 5 Mounting Chapter contents 5 1 Mounting the unit on page 32 Mounting 31 ...
Страница 48: ...48 ECI 100 ...
Страница 54: ...54 ECI 100 ...
Страница 56: ...56 ECI 100 ...
Страница 57: ......