32
Note: For plastic pipes
position sensor on metal
boiler coupling
Sensor positioning
on metal pipes
Sensor positioning
on plastic pipes
HWAT-R/-M/-L
Min. 200 mm
Min. 200 mm
Insulation
HWAT-ECO sensor
Aluminium tape
Pipe/boiler coupling
Boiler
Boiler
ATE-180
A
B
C
B A
4
TEMP BMS
MASTER
B A
1
TEMP BMS
2
SLAVE 1
OPTIONAL
BMS
SLA
VE 2
+
-
+
-
3
MASTER
RayClic
F1
F2
L N
HWAT 230V TEMP BMS
ALARM
5.5 Diagrams
5.5.1 Diagrams A, B, C, D, E, F, G and H, Installation
Tyco C 9278e HWAT-ECO 22.02.2002 14:12 Page 32
Содержание HWAT-ECO
Страница 2: ...3 148 mm 1 2 A B C Tyco C 9278e HWAT ECO 22 02 2002 14 12 Page 2 ...
Страница 28: ...28 Fig 10 Example Fig 11 Tyco C 9278e HWAT ECO 22 02 2002 14 12 Page 28 ...
Страница 29: ...29 Fig 12 Tyco C 9278e HWAT ECO 22 02 2002 14 12 Page 29 ...
Страница 97: ...Fig 10 Exemple Fig 11 97 Tyco C 9278f HWAT ECO 22 02 2002 14 10 Page 97 ...
Страница 98: ...Fig 12 98 Tyco C 9278f HWAT ECO 22 02 2002 14 10 Page 98 ...