IMPORTANT:
Do not insert the analyser
probe into the sample point immediately
or leave in long periods. This will prevent
saturation of the analyser.
During the calibration function the
combustion ratio may increase for a
short time while the boiler performance is
optimised.
The person carrying out a combustion
measurement should have been assessed
as competent in the use of a flue gas
analyser.
The flue gas analyser used should be one
meeting the requirements of BS7927 or BS-
EN50379-3 and be calibrated in accordance
with the analyser manufacturer’s
requirements.
Fig. 37
ELECTRODES POSITION
Anti-clockwise to increase CO
2
.
Clockwise to decrease CO
2
.
After any new regulation wait to stabilise
for about one minute.
Replace the front cover.
TABLE 9
- The ignition control will automatically make
three attempts to start, if it doesn’t start this
may be due to air in the gas supply line.
If the burner fails to light, the digital led
display and fan will stop, and the display will
show the lockout code (E01 depicts flame
failure).
- If necessary push the boiler Reset button
(item 2 fig.1) and the boiler will restart
automatically.
- After the boiler has lit, allow to warm at
minimum temperature setting to purge any
air from the system.
- Once the system has been purged of air,
set the heating temperature to the desired
setting.
6.8
CHECK THE GAS PRESSURE
Check the gas mains pressure at the gas
valve inlet pressure test point (fig.35) with the
boiler operating at full rate.
Check with the Local Gas supplier if the
pressure differs significantly from 20 mbar
G20 (natural gas), 37 mbar G31 (propane).
With leak detection fluid test for gas tightness
of all gas components and joints.
IMPORTANT:
The Gas Valve Throttle adjuster is required
to be sealed with tamper proof paint after
adjustment (fig. 35).
6.9 COMBUSTION CHECK
Check all gas carrying components along with,
the combustion of the appliance which should
be checked as follows.
Remove the front panel of the appliance.
Ensure the boiler and external controls are
calling for heat. Turn on the electrical supply.
open the hot water tap at maximum flow rate.
Wait at least five minutes or until the unit has
reached its operating temperature.
Unscrew the test sample screw on the boiler
elbow bend (item 60 fig. 10). Measure the level
of CO
2
. Check the reading against the
corresponding value in table 9.
It is essential that this test is repeated with
the casing on as this will check the integrity
of the flue.
If adjustment proves necessary then proceed
as follows.
IMPORTANT:
Any adjustment to the gas
valve should only be carried out by a
qualified person.
Referring to the table 9, adjust the
maximum level of CO
2
with the Throttle
using a 2.5 mm hex on the gas valve
(fig.35).
Содержание HE 25 S COMPACT
Страница 2: ...2...
Страница 4: ...4...
Страница 5: ...5...
Страница 25: ...5 5 FLUE TERMINAL POSITION 25...
Страница 54: ...10 ELECTRICAL SYSTEM DIAGRAM 54 Fig 55...
Страница 55: ...55 11 SPARE PARTS Fig 56...
Страница 61: ...61...
Страница 62: ...62...
Страница 63: ...63 www centralheating co uk Benchmark Commissioning and Servicing Section...
Страница 64: ...64 FLOWCHART FOR CO LEVEL AND COMBUSTION RATIO CHECK ON COMMISSIONING A CONDENSING BOILER...
Страница 65: ...65 12 1 ANALYSER CHECK LIST...
Страница 66: ......