
CHAPTER 3
22
Raven SC1™/TC1™ Calibration & Operation Manual for Towed Implements
20.Touch the Start button to begin the automatic calibration of the hydraulic valve.
NOTE:
During the calibration, the plough bodies will move fully through the range of calibrated settings. It is
important that the plough not be in contact with the ground during the calibration process.
FIGURE 24. Implement Mins Calibration
21. Once the calibration is complete, select the
Next
button.
CALIBRATION WIZARD SUMMARY
1. Review the Calibration Wizard Summary screen displayed.
FIGURE 25. Calibration Wizard Summary
2. Select the
Accept
button to complete the calibration wizard and display the Home screen. Refer to Chapter 4,
Routine Implement Operation
, for assistance with operation of the SC1/TC1 guidance and steering system.
Содержание SC1
Страница 28: ...CHAPTER 3 24 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Страница 36: ...CHAPTER 4 32 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Страница 48: ...CHAPTER 5 44 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Страница 54: ...CHAPTER 6 50 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Страница 74: ...CHAPTER 8 70 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Страница 76: ...Index 72 Raven SC1 TC1 Plough Steering Calibration and Operation Manual...