WIRING INSTALLATION
CONNECT THE HARNESS TO THE POWER/CAN CONTROLS
90’-100’ BOOMS
FIGURE 3. AutoBoom Harness Cable Installed
1. Locate the existing harness cable bulkhead on the center boom section, near the pressure transducers on the
sprayline.
2. Disconnect the cable from the bulkhead connector.
3. Attach the appropriate ends of the AutoBoom harness cable (P/N 115-0230-073) to the existing cable and the
bulkhead connector
FIGURE 4. CAN and Logic Power Connections
4. Locate the existing CAN and auxiliary power connectors on the top of the center rack, near the machine
hydraulic valve.
5. Connect the existing CAN connector to the CAN tee on the AutoBoom harness cable (P/N 115-0230-073).
6. Reconnect the existing harness or the CAN terminator on the other end of the CAN tee.