
Operation 19
Conveyor and Blower
Press the Conveyor and Blower “ON” (green button) to start the conveyor
and blower in the heat tunnel.
To turn the conveyor and blower off press the red Conveyor and Blower
“OFF” button.
Tunnel Heater
Turn the tunnel Heater Switch to the “ON” position.
Setting the Tunnel Temperature
Use the programmable switch to set the temperature
inside the shrink tunnel. The programmable switch will
display the current temperature inside the heat tunnel
(top) and the temperature setting.
Press the “SET” button to set the temperature.
Press this button to select the digit to change.
The selected digit will begin to flash.
Press the Up or Down arrows to change
the value of the selected digit.
Press the “SET” button to save the new values.
Attention!
Do Not
set the temperature higher than 350°. Setting the
temperature higher than 350° will damage the machine and the
product.
The output light will turn on while the tunnel is heating up.
Содержание Eastey Value Series
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 29: ...Electrical Schematic 29 Electrical Schematic...
Страница 30: ...30 Electrical Schematic Electrical Schematic Continued...
Страница 31: ...Illustrated Parts List 31 Illustrated Parts List...
Страница 32: ...32 Illustrated Parts List...
Страница 33: ...Illustrated Parts List 33...
Страница 34: ...34 Illustrated Parts List...
Страница 35: ...Illustrated Parts List 35...
Страница 36: ...36 Illustrated Parts List...
Страница 37: ...Illustrated Parts List 37...
Страница 38: ...38 Illustrated Parts List...
Страница 39: ...Illustrated Parts List 39...
Страница 40: ...40 Illustrated Parts List...
Страница 41: ...Illustrated Parts List 41...
Страница 42: ...42 Illustrated Parts List...
Страница 43: ...Illustrated Parts List 43...
Страница 48: ......
Страница 49: ......