
16 Installation and Set Up
Aligning the Shrink Tunnel
When the film, product tray and product are correctly aligned, release the red lever
stopper and position the entire sealer and product tray assemblies in line with the shrink
tunnel opening centering the product down the center of the tunnel. Reset the red lever
stopper to lock the sealer assembly in position.
Red Lever
Stopper
Shrink
Tunnel
Opening
Sealer and
Product Tray
Assemblies
Содержание Eastey Value Series
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 29: ...Electrical Schematic 29 Electrical Schematic...
Страница 30: ...30 Electrical Schematic Electrical Schematic Continued...
Страница 31: ...Illustrated Parts List 31 Illustrated Parts List...
Страница 32: ...32 Illustrated Parts List...
Страница 33: ...Illustrated Parts List 33...
Страница 34: ...34 Illustrated Parts List...
Страница 35: ...Illustrated Parts List 35...
Страница 36: ...36 Illustrated Parts List...
Страница 37: ...Illustrated Parts List 37...
Страница 38: ...38 Illustrated Parts List...
Страница 39: ...Illustrated Parts List 39...
Страница 40: ...40 Illustrated Parts List...
Страница 41: ...Illustrated Parts List 41...
Страница 42: ...42 Illustrated Parts List...
Страница 43: ...Illustrated Parts List 43...
Страница 48: ......
Страница 49: ......