18 Operation
Operation
The Eastey L-Bar Sealing Machine is very easy to operate. Become familiar with the
control panel and timers located on the operator side of the machine.
Tunnel Operation
Main Power
To begin operation turn,
the “Main Switch” to the “ON”
position.
The “Main Switch” controls power for both the
tunnel and sealer.
Energizing Seal Band
Time Adjustment*
*See Caution.
Содержание Eastey Value Series
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 29: ...Electrical Schematic 29 Electrical Schematic...
Страница 30: ...30 Electrical Schematic Electrical Schematic Continued...
Страница 31: ...Illustrated Parts List 31 Illustrated Parts List...
Страница 32: ...32 Illustrated Parts List...
Страница 33: ...Illustrated Parts List 33...
Страница 34: ...34 Illustrated Parts List...
Страница 35: ...Illustrated Parts List 35...
Страница 36: ...36 Illustrated Parts List...
Страница 37: ...Illustrated Parts List 37...
Страница 38: ...38 Illustrated Parts List...
Страница 39: ...Illustrated Parts List 39...
Страница 40: ...40 Illustrated Parts List...
Страница 41: ...Illustrated Parts List 41...
Страница 42: ...42 Illustrated Parts List...
Страница 43: ...Illustrated Parts List 43...
Страница 48: ......
Страница 49: ......