Preparing for Use
R&S
®
QAR
19
User Manual 1178.7200.02 ─ 04
Figure 4-3: Support installation (top view)
4. Lift the R&S
QAR into a stable position and in a right angle to the floor.
5. Secure the R&S
QAR by screwing the two supports to the floor.
The drill holes in the floor define the position of the supports. Two anchor bolts with
a size of 12
mm secure each support.
Make sure that all screws are screwed on tightly.
4.2.2
Installing the R&S
QAR on the Platform (R&S
QAR-Z20)
Required tools:
●
Allen wrench size 5 (for screws ISO 10642 M8x20)
●
Allen wrench size 6 (for screws ISO 4762 M8x40)
●
Allen wrench size 10 (for screws ISO 4762 M12x55)
●
Open-end wrench size 19
●
Spirit level.
Installing the platform
1. Place the platform on a stable and horizontal surface that can support the weight of
the R&S
QAR.
2. Check with a spirit level if the platform itself is level.
3. If necessary, remove any irregularities by adjusting the height of the feet until the
platform is level.
● A clockwise movement lowers the corresponding platform area.
Installing the R&S
QAR