![R&S OSP Series Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/rands/osp-series/osp-series_getting-started_3084345013.webp)
Preparing for Use
R&S
®
OSP
13
Getting Started 1178.7117.02 ─ 03
4
Preparing for Use
This section describes the basic steps to be taken when setting up the R&S
OSP
for the first time and putting it into operation.
4.1 Unpacking and Checking the Switch Unit........................................... 13
4.3 Placing or Mounting the Instrument.....................................................15
4.5 Switching the Instrument On and Off...................................................17
4.6 Checking the Installed Modules........................................................... 19
4.7 Configuring the Initial Instrument Settings......................................... 19
4.1
Unpacking and Checking the Switch Unit
Check the equipment for completeness using the delivery note and the accessory
lists for the various items. Check the equipment for any damage. If parts of the
equipment are missing or if there is damage, immediately contact the carrier who
delivered the equipment.
Packing material
Retain the original packing material. If the instrument needs to be transpor-
ted or shipped later, you can use the material to protect the control ele-
ments and connectors.
Unpacking and Checking the Switch Unit