unifiedbrands.net
9
Unit Installation
SELECTING A LOCATION FOR YOUR NEW UNIT
The following conditions should be considered when selecting a location for your
unit:
1.
Floor Load: The area on which the unit will rest must be level, free of
vibration, and suitably strong enough to support the combined weights
of the unit plus the maximum product load weight. All casters or legs
must be in contact with the floor to support the weight. Legs have
adjustable feet that can be raised or lowered. Casters may require
shims in order for the caster to be in contact with the floor.
NOTE: If there is a question pertaining to weight load limits, consult the
factory at 1-800-621-8560.
2. Clearance: There must be a combined total of at least 3” clearance on
all sides of the unit.
3. Ventilation: The air cooled self contained unit requires a sufficient
amount of cool clean air. Avoid surrounding your blast chiller around
other heat generating equipment and out of direct sunlight. Also, avoid
locating in an unheated room or where the room temperature may drop
below 55° F (13°C) or about 86°F (32°C).
INSTALLATION CHECKLIST
After the final location has been determined, refer to the following checklist prior to
start-up:
1. Check all exposed refrigeration lines to ensure that they are not kinked,
dented, or rubbing together.
2. Check that the condenser and evaporator fans rotate freely without
striking any stationary members.
3. Turn on control once unit has been plugged in or properly wired direct
(see page 15)
4. Allow unit time to cool down to holding temperature. (See page 10 for
Unit Operation).
5. Refer to the front of this manual for serial number location. Please
record this information in your manual on page 3 now. It will be
necessary when ordering replacement parts or requesting warranty
service.
6. Confirm that the unit is holding temperature.
7. Allow your unit to operate for approximately 30 minutes before putting
in food to allow interior of unit to cool down to storage temperature.
NOTE: All motors are oiled and sealed.
NOTE: FAILURE TO FOLLOW INSTALLATION GUIDELINES AND
RECOMMENDATIONS MAY VOID THE WARRANTY ON YOUR UNIT.
Содержание BC-18-PUB
Страница 2: ......
Страница 27: ...unifiedbrands net 27 Electrical Diagram...
Страница 28: ...28 800 621 8560 Electrical Diagram Control Wiring...
Страница 29: ...unifiedbrands net 29 Replacement Parts Blast Chiller...
Страница 30: ...30 800 621 8560 Replacement Parts Blast Chiller Control Panel...
Страница 31: ...unifiedbrands net 31 Replacement Parts Blast Chiller Door Assembly...
Страница 32: ...32 800 621 8560 Replacement Parts Blast Chiller Condensing Unit...
Страница 33: ...unifiedbrands net 33 Replacement Parts Blast Chiller Evaporator Coil Assy...