2008, october, 17
8-2 Airframe maintenance
( to be carried out periodically as per table below)
The following maintenance tables never can replace the pre-
flight check, obligatory before every take-off.
Nota: these maintenance periods concern only the aircrafts flying under a continental climate and
being stocked under hangar. The aircrafts submitted to other conditions will have to be more
frequently checked.
Périodicity
1 month
50 h
6 month
150 h
1 year
300 h
2 years
600 h
5 years
900 h
Wings, control surfaces and empennage fabrics
V
C
Fork and landing gear
Tyres pressure (1.8)
V
Tyres wear
V
Brakes wear
V
Front fork and main gear shok absorbers
V
Windsreen
V
Controls
Ailerons cables
V
L
C
Ailerons tubes and tubes-and socket-joints
V
L
C
Rudder cables
V
V
C
Handle stick joint
L
C
Elevator control
V
V
C
Choke and throttle cables
V
L
C
Flaps control
V
C
Electric wiring and fuel line
Take care of scrapping and wear
Electric wires
V
Battery
V
Fuel hoses
V
R
Handle fuel pump
V
R
Fuel filter
V
R
Fuel tank
V
Control surfaces, trim, mobile parts
axels
L
C
Bellcrank / quick links
V
C
Câble trim
L
C
Bolts
V
C
NOTA
:
V
= Verify and replace if necessary
R
= Replace
L
= Lubricate, verify and replace if necessary
C
= Control by a competent professional and replace if necessary
Содержание X-AIR HANUMAN 602T AP
Страница 10: ...2008 october 17 ...
Страница 16: ...2008 october 17 ...
Страница 20: ...2008 october 17 ...
Страница 28: ...2008 october 17 ...
Страница 36: ...2008 october 17 ...