background image

17

6.1. Connections to be made by the
user

Hook-up must be carried out by qualified
personnel in full accordance with federal,
state and local regulations.

6.1.1. Water and gas supply  

(Fig.5)

Connections must be installed close to the machine.

• Water drainage pipe 1, having a minimum internal

diameter of 30 mm, equipped with a water-trap
accessible for inspection.

• Water supply pipe 2, with a 3/8"G cut-off tap.

Make sure that the maximum supply pressure
does not exceed 6.5 Mpa; otherwise, install

a pressure reducer.

6.1.2. Electric supply 

(Fig.5)

The machine is supplied ready for connection according
to the required electrical specifications.
Before connecting the machine ensure that the plate
details comply with those of the electric distribution
network.
The electrical connection cable must be directly con-
nected to the connection provided according to
current legislation. Ensure that the grounding system
is efficient and in compliance with current legal re-
quirements.
The grounding system and the lightning protection
system must be realized in accordance with the pro-
visions of current legislation.
For the supply network use a cable in compliance
with standards with protective conductor (grounding
wire).
For three-phase power use a cable with 3 conductors
( 3 n ground).
For single phase power supply use a cable with 3
conductors (phase + n ground).
In both cases it is necessary to provide an automatic
differential switch (

Fig. 5

) at the start of the power

cable, complete with magnetic release elements in
accordance with the identification plate details (

Fig.

1

). The contacts must have an opening of equal or

over 3 mm and with dispersed current protection of
30 mA.
Remember that each machine must be fitted with its
own safety elements.

WARNING:

Should the power supply cable be damaged
it is to be replaced by the manufacturer or by
its technical assistance service or by person
with equivalent qualification, in order to
prevent any risks.

6.2. Preliminary operations 

(Fig.6)

P O T E N T I A L - E Q U A L I Z I N G
CONNECTION

This connection, which is the one called for by several
norms, avoids electrical potential differences, building
up between any equipment that may be installed in
the same room. There is a terminal clip on the under
side of the base of the machine to which an external
potential-equalizing wire should be connected.
This connection is 

ABSOLUTELY NECESSARY

 and

must be made right after the machine is installed.
Use a wire whose cross-sectional area conforms to
the existing norms.

6.3 ANTISUCTION VALVE
INSTALLATION 

(Fig.7)

On the top of the boiler there is the antisuction valve.

When installing the machine make sure to remove
the plastic fork “A” and check that the pin ”B” is
not blocked.

This operation is very important for the correct
working of the machine.

• Place the machine on the horizontal surface

previously prepared.

Before connecting, thoroughly wash the mains water
pipes:
• Leave the water supply taps running at full pressure

for several minutes.

• Connect to the mains water supply.
• Connect the machine to the socket.

Thoroughly wash all the water pipes of the machine:
• Leave the water supply taps running at full pressure.

• Switch on main switch 1 (Fig.8): wait until the boiler

fills up to the level set.

• Switch on boiler resistance switch 2 (Fig.8) to begin

heating the water in the boiler.

• Operate each unit in order to allow the water to

escape for about one minute; repeat the operation
twice.

• Deliver steam from the steam jets for about one

minute.

• Deliver hot water for about one minute; repeat the

operation twice.

• Switch off switches 1 and 2.
• Empty the water from the boiler: see point 10.3.1.

IMPORTANT

Should the machine not deliver water for over
24 hours, wash the internal components be-
fore beginning work, repeating the operations
as described above.

6.4. Connections

Содержание Classe 8 S

Страница 1: ...Use and maintenance espresso machine classe 8 DE S...

Страница 2: ...s product consistency assures that the equipment we have supplied you with is the most functional safe and satisfactory of its kind to be found on the market with regards to both its design and effic...

Страница 3: ...dte Vorschriften Applied standards Normas aplicadas Normas aplicadas Descrizione attrezzatura a pressione Description de l appareillage sous pression Beschreibung der unter Druck stehenden Ger te Pres...

Страница 4: ...4...

Страница 5: ...5 Fig 1 Fig 2 A...

Страница 6: ...6 Fig 3 1 1 2 2 6 6 2 1 4 5 5 8 8 9 9 10 11 16 12 12 13 15 15 10 11 16 MOD DE MOD S 7 3 14...

Страница 7: ...7 4 L o v a t o L 2 3 8 G 1 30 mm Fig 4 Fig 6 Fig 5 Fig 7 H D C B A...

Страница 8: ...8 Fig 8 7 4B 9 1 2 3 10 MOD DE MOD S 4B A B C D E 9 10 4A 7 1 2 3 4A 5A 5B 6 8 6 1 6 2...

Страница 9: ...A SET ORA FORMATO DATA ORA SET TIMER ACCENSIONE AUTOMATICA DOMENICA ON DUR CLOCK SET TIMER SET DATE CLOCK MODE SET TIME STAND BY TIMER SUNDAY ON DUR CLEANING COFFEE press ENTER INSERT THE BLIND FILTER...

Страница 10: ...10 Fig 15 Fig 17 Fig 18 Fig 16...

Страница 11: ...11 Fig 19 Fig 20 Fig 22 Fig 24 Fig 23 4 1 2 3 Fig 21...

Страница 12: ...ng tea camomile etc 55 8 5 Machines with TSC automatic system 56 8 5 1 Heating Milk or a Drink TSC 56 8 5 2 Preparing Frothed Milk TSC 56 8 6 Programming functions 56 8 6 1 Programming panel DE 56 8 7...

Страница 13: ...network before connecting the equipment Adaptors multiple sockets and or extensions must not be used In doubt request an accurate reading of the electrical supply by qualified personnel The electric...

Страница 14: ...in which the water is heated By pressing the appropriate buttons water is supplied to the spouts in the form of hot water or steam according to your need The hot water used to make drinks comes from t...

Страница 15: ...bel Fig 1 4 USE The machine has been designed manufactured and protected to be used to make espresso and hot beverages tea cappuccino etc Any other use is to be considered unsuitable and therefore dan...

Страница 16: ...otection The packaging bears symbols which must be observed during handling and stocking of the item Always keep the package in a vertical position during transport Do not turn it over or lay it on it...

Страница 17: ...s to be replaced by the manufacturer or by its technical assistance service or by person with equivalent qualification in order to prevent any risks 6 2 Preliminary operations Fig 6 P O T E N T I A L...

Страница 18: ...tric counter is malfunctioning the LED of the pressed button flashes dispensing the dose on a time basis 5A Hot water button picking up directly from the boiler with two positions Mod S With switch ON...

Страница 19: ...ly possible when the blades of the coffee grinder are sharp and are then measured out into the correct quantities roughly 6 grams per measure The importance of freshly ground coffee beans is due to th...

Страница 20: ...interrupted by pressing the button 5B When purified water is used these beverages often assume a darker color Should the user prefer a lighter colored drink draw fresh water from an ordinary tap and...

Страница 21: ...e led of the E button on the first button panel on the left starts flishing The machine is ready to accept quantity variations 2 Put a cup or a jug to receive the water under the water spout 15 Fig 3...

Страница 22: ...veral times Make a coffee to eliminate any unpleasant taste Cleaning the filters and delivery heads Fig 20 Operation to be carried out when the machine is off and cold Prepare a solution of 4 sachets...

Страница 23: ...wer failure wait for the power to return and check if the earth leakage protection circuit breaker or the main switch is on check the condition of the plug and the supply cable if damaged have them re...

Отзывы: