COPYRIGHT © 2019 SANDVIK MINING AND CONSTRUCTION OY
Page 36 - Operation
Operation
RSS05R, RSS08R, RSS11R, RSS15R, RSS23R, RSS34R,
RSS45R, RSS58R, RSS80R
6. Install the locking pins and cotter pins.
7. Move the carrier aside, if needed.
INSTALLATION ON THE CARRIER
Warning! The residual air in the hoses must always be removed before
operation!
1. Remove the cotter pins and take out the locking pins.
MB010087
MB010086