COPYRIGHT © 2020 SANDVIK MINING AND CONSTRUCTION OY
Page 36 - Operation
Operation
255E
5.6 STORAGE
LONG TERM STORAGE
Observe the following points when the hammer is stored. In this way the vital parts
of the attachment are protected from rust and the machine is ready to be used
whenever necessary.
1. The storage area must be dry.
2. The tool must be removed in hydraulic hammers.
3. The lower end of the piston, tool and tool bushings must be well protected with
grease in all hydraulic hammers.
4. Connections must be sealed with clean plugs to prevent oil leakage and dirt
from getting into couplings.
5. The product must be stored in the vertical position.
6. Make sure the product cannot fall.
Содержание 255E
Страница 1: ...Original instructions 8 20 OPERATOR S MANUAL OM255EENG 820 HYDRAULIC HAMMER RAMMER 255E...
Страница 3: ...Operation Page 3 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY 255E OPERATION...
Страница 37: ...Lubrication Page 37 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY 255E LUBRICATION...
Страница 46: ...COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY Page 46 Lubrication Carrier hydraulic oil 255E...
Страница 47: ...Maintenance Page 47 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY 255E MAINTENANCE...
Страница 59: ...Specifications Page 59 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY 255E SPECIFICATIONS...
Страница 67: ...Page 67 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY...