
Operation - Page 37
COPYRIGHT © 2020 SANDVIK MINING AND CONSTRUCTION OY
Operation
1533E STD
6. If you have to check or remove hose connections in the hammer, remove shield
plate by pulling it out of the housing. Then you can reach to the connections.
7. The carrier can be moved aside.
INSTALLATION
1. Install hammer in the same manner as mounting a bucket. Install bucket pins.
2. Connect hoses. Hammer inlet port is marked on the valve body with "IN" and
outlet port with "OUT". An installation inspection must be carried out after the
product has been mounted on the carrier. In the installation inspection certain
specifications (such as operating pressure, oil flow) are checked so that they are
within given limits. See “Hammer specifications” on page 66.
3. Open hammer inlet and outlet lines.
Item
Torque
Mounting screws for flange couplings
(H)
70 Nm (52 lbf ft)
R0102
8
6
R0104
8
4
H
Содержание 1533E
Страница 1: ...Original instructions 4 20 OPERATOR S MANUAL OM1533ESENG 420 HYDRAULIC HAMMER RAMMER 1533E STD ...
Страница 3: ...Operation Page 3 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY 1533E STD OPERATION ...
Страница 40: ...COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY Page 40 Operation Operation 1533E STD ...
Страница 41: ...Lubrication Page 41 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY 1533E STD LUBRICATION ...
Страница 53: ...Maintenance Page 53 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY 1533E STD MAINTENANCE ...
Страница 64: ...COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY Page 64 Maintenance Troubleshooting 1533E STD ...
Страница 65: ...Specifications Page 65 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY 1533E STD SPECIFICATIONS ...
Страница 73: ...Page 73 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY ...