REMOVING THE COMBUSTION CHAMBER LINING
REMOVING THE COMBUSTION CHAMBER LINING
Procedure for removing the combustion chamber lining:
1. Push upwards on the flue plate (1) until it moves freely
.
Afterwards, turn it down past the side combustion chamber
lining.
2. Lift up the front combustion chamber lining (2) and remove.
3. Lift up the bottom combustion chamber lining (3).
4. Remove the side combustion chamber lining sections (4) by
turning them inwards at the front until they are loose. They
can now be removed.
5. This makes it possible to remove the rear combustion
chamber lining (5).
6. Lift up the flue plate (6) until it releases from the fittings and
push it back. It can now be removed.
To re-install
the combustion chamber lining sections, repeat
the above procedure in reverse order.
Содержание Q-TEE
Страница 2: ...GB...
Страница 23: ...800 GB 22 GB GB INSTALLATION DISTANCES Installation distances flammable Flammable ceiling...
Страница 26: ...800 25 GB GB INSTALLATION DISTANCES Installation distances flammable Flammable ceiling...
Страница 47: ...1 2 3 4 5 9 6 7 8 10 GB 46 GB GB SPARE PARTS DRAWING...
Страница 49: ...2 9 6 7 8 10 1 3 4 5 GB 48 GB GB SPARE PARTS DRAWING...
Страница 51: ...2 9 6 7 8 10 1 3 4 5 GB 50 GB GB SPARE PARTS DRAWING...
Страница 53: ...10 1 7 8 2 3 4 9 6 5 GB 52 GB GB SPARE PARTS DRAWING...
Страница 57: ...GB 56 GB GB...
Страница 58: ...57 GB GB DECLARATION OF PERFORMANCE...
Страница 59: ...GB 58 GB DECLARATION OF PERFORMANCE...