WS-PRO2 Weather Station Manual
GT
27176
Page 17 of 61
Figure 11
3.1.0 Base Tower Components
3.1.0.1 Supplied Components
(1) Upper Tower Section (Tapered)
(1) Lower Tower Section
(6) ½ inch Washers
(1) 12 foot 10 AWG Ground Cable
(1) Tower Cap
(1) 20' communications cable
(1) 20' power cable
Refer to Section 2 for components supplied by installer.
3.1.1 Tower Installation
Attach the tower to the base as shown in Figure 12.
1. Dig a hole close to the concrete base to access the lower conduit
opening. From the hole, trench to the power and communications
sources. Remove the duct tape from both ends of the conduit.
2. Remove the template. Attach the two pieces of the tower. This is a
permanent connection and cannot be undone. Lay the tower on
the ground with the base next to the concrete foundation.
3. Thread communications and power cables through the tower and
conduit. Electrical tape will help.
SIDE VIEW
TOP VIEW
ANCHOR BOLT
FORM
FORM WIRE
CEMENT PAD
SMALL
CAVITY
24"
24"
24"
TEMPLATE
2"
NORTH
FORM WIRE
Содержание WS-PRO2
Страница 22: ...WS PRO2 Weather Station Manual GT 27176 Page 22 of 61 Figure 13...
Страница 24: ...WS PRO2 Weather Station Manual GT 27176 Page 24 of 61 Figure 14...
Страница 26: ...WS PRO2 Weather Station Manual GT 27176 Page 26 of 61 Figure 15...
Страница 28: ...WS PRO2 Weather Station Manual GT 27176 Page 28 of 61 Figure 17...
Страница 32: ...WS PRO2 Weather Station Manual GT 27176 Page 32 of 61 Figure 20...
Страница 33: ...WS PRO2 Weather Station Manual GT 27176 Page 33 of 61 Figure 21...
Страница 46: ...WS PRO2 Weather Station Manual GT 27176 Page 46 of 61 Figure 32...
Страница 51: ...WS PRO2 Weather Station Manual GT 27176 Page 51 of 61 Figure 36 Figure 37 Leveling Screws Leveling Screws...