background image

P/N R9340-0104                                     37           © 2010 RAILWAY  EQUIPMENT CO. 
REV B 
5/11 

XI. 

   LIMITED 

WARRANTY 

 

 

Railway Equipment Co., Inc. (“Railway”) warrants all of its products to be free  from defects in material and  

                workmanship when used under specified operating conditions and within specified limits.  Railway’s  
                warranty shall extend for a period of two (2) years from the date of shipment to the original purchaser. 
 
 

This warranty is expressly in lieu of and excludes all other expressed or implied warranties, including but not  

                limited to warranties of merchantability and fitness for a particular purpose. 
 
 

Railway, its agents, or representatives shall in no circumstance be liable for any direct, indirect, special,  

                penal, or consequential loss or damage of any nature resulting from the malfunction of the product. 
 
 

Remedies under this warranty are expressly limited to repair or replacement of the product at the sole  

                discretion of Railway. 
 
 

Before returning any defective product to Railway, contact the factory at the address or telephone number at  

                the bottom of this article for a Return  Merchandise Authorization number and instructions as to how and  
                where the return is to be shipped.  Materials received without this authorization will be returned at the  
                customer’s expense.   
 
 

Products returned to Railway under warranty must be shipped freight prepaid, and return freight charges for 

                repaired or replaced products, in or out of warranty, will be at customer’s expense. 
 
 

Railway reserves the right to reject any warranty claim on a product that has been altered by the user or  

                damaged in shipping due to inadequate packaging or mishandling by freight carrier. 
 
 

By returning a product to Railway the owner grants permission to Railway to   open and disassemble the  

                product as required for evaluation.  Railway has the sole responsibility for determining the cause an nature of  
                failure, and Railway’s determination with regard thereto shall be final.  Railway reserves the right to 
 

repair or replace any unit at its sole discretion. 

 
 

A returned product that is found, upon inspection by Railway, to be operational within specification is subject  

                to an inspection and testing fee, regardless of its warranty period. 
 
                Railway’s liability on any claim of any kind (including negligence) for any loss or damage arising out of or  
                resulting from this agreement, or from the performance of breach thereof, of from the products or services 
                furnished hereunder, shall in no case exceed the price of the specific product or service which gives rise to 
                the claim.  All such liability shall terminate upon the expiration of the warranty period of two (2) years, as  
                hereinabove stated. 
 
 

The furnishing of advice or other assistance without separate compensation therefore will not subject Railway  

                to any liability, either in contract, warranty, tort (including negligence) or otherwise. 
 
 

Any alteration or modification of the product, or addition on non-Railway components to the product, unless  

                expressly permitted by Railway in its documentation, will void warranty coverage. 
 
 

This warranty is non-transferable, and warranty coverage is limited to initial user only. 

 
 

Installation and/or use of the product shall demonstrate acceptance of the terms of this warranty. 

 
 

Each of the foregoing paragraphs in this article will apply to the full extent permitted by law.  The invalidity,  

                in whole or part, of any paragraph will not affect the remainder of such paragraph or any other paragraph. 
 

RAILWAY EQUIPMENT CO. 

P.O. Box 68 – Delano, Minnesota 55328  USA 

Tel. (763) 972-2200 Fax (763) 972-2900 

E-Mail - [email protected] 

 
 
  

Содержание 934

Страница 1: ...934 ELECTRIC HOT AIR BLOWER TRACK SWITCH SNOW MELTER 480 230 VAC 1 3 PHASE 50KW AND 60 KW LOAD CAPACITY MANUFACTURED BY RAILWAY EQUIPMENT COMPANY 15400 MEDINA ROAD PLYMOUTH MINNESOTA 55447 TEL 763 97...

Страница 2: ...STAND AND FOLLOW THESE INSTRUCTIONS SHOULD USE OR SERVICE THIS HEATER IF YOU NEED ASSISTANCE OR HEATER INFORMATION SUCH AS INSTRUCTION MANUALS LABELS ETC CONTACT THE MANUFACTURER CAUTION WARNING FIRE...

Страница 3: ...NY BEFORE PROCEEDING SHEET METAL EDGES MAY BE VERY SHARP AND CAN CAUSE SEVERE CUTS OR LACERATIONS PROTECTIVE GLOVES AND CLOTHING SHOULD BE WORN USE CAUTION WHEN HANDLING ALL SHEET METAL COMPONENTS THI...

Страница 4: ...AIN HAB UNIT 13 C POINT NOZZLES AND TRACK DUCTS 14 F ELECTRICAL CONNECTION 17 IV CONTROL MODULE 18 A DESCRIPTION 18 B MODULE CONTROLS AND INDICATORS 18 C FAULT CONDITIONS 20 D ADVANCED FEATURES 23 E O...

Страница 5: ...T 7 STANDARD WITH FLEX NOZZLES XXX X X X X OUTLET DUCT K STEEL TIE DUCT WITH 115 PLATES 9 N STEEL TIE DUCT WITH 136 PLATES 9 G STEEL TIE DUCT WITH 115 PLATES FOR SNF H STEEL TIE DUCT WITH 136 PLATES F...

Страница 6: ...ure 16 Status indicating lights for all control functions 17 Start delay timer for sequential startup 18 Run timer for timed operation 19 Selectable Transparent snow detector operation 20 Snow detect...

Страница 7: ...complete control of operation See separate description and details section IV 5 AIRFLOW SWITCH Located in the heat duct the sail switch indicates proper airflow before and during burner operation The...

Страница 8: ...5 point a 5 mid and 10 sections to complete the desired length 6 TRACK DUCT NOZZLE Attaches to the inner two rectangular openings on the top of the outlet duct Directs airflow down the length of the...

Страница 9: ...an access opening underneath the insulating wrapper cover If additional duct extensions are required this assembly can be added between the outlet duct and the offset duct 2 7 TRACK DUCT These track d...

Страница 10: ...P N R9340 0104 10 2010 RAILWAY EQUIPMENT CO REV B 5 11 INTENTIONALLY LEFT BLANK...

Страница 11: ...lates Ensure that the tie duct is centered between the adjacent ties 4 Place a rubber pad on the tie plate then using a suitable lever raise one end of the tie duct until the rail lies correctly on th...

Страница 12: ...Draw the hex nut hand tight and then loosen one turn 6 Thread a hex nut about halfway onto each bolt 7 Place the blower unit on the foundation using a flat washer on the top and bottom of the foundat...

Страница 13: ...0 ft elevation set Airflow Differential Wheel to C Below 6000 ft elevation set Airflow Differential Wheel to B Above 6000 ft elevation set Airflow Differential Wheel to A C POINT NOZZLES AND TRACK DUC...

Страница 14: ...the bracket bases Place the hold down straps over the track ducts Attach the hold down strap to the track duct support brackets by inserting the spring clip into the strap 6 Push in the square knockou...

Страница 15: ...P N R9340 0104 15 2010 RAILWAY EQUIPMENT CO REV B 5 11 INTENTIONALLY LEFT BLANK...

Страница 16: ...when the unit is operating under remote control b 24 VDC Place a jumper between terminal posts TS1 2 and TS1 4 24 VDC indication is now present on post TS1 3 with common at terminal post TS1 6 6 FAIL...

Страница 17: ...l Snow Detector Head Adjustable start up delay sequence Adjustable run timer for timed or continuous operation Adjustable snow detect timer for use with optional snow detector Operator control and ind...

Страница 18: ...nsing head s senses moisture 3 REMOTE CONTROL On when there is a circuit closure across terminal posts 1 and 2 4 SAIL SWITCH On when the sail switch in the air stream is sensing adequate airflow 5 IND...

Страница 19: ...the unit will start the cool down if the unit was started locally or by dispatch 4B SNOW TIMER Snow timer displays the time remaining until the heat contactor will be disabled and start the cool down...

Страница 20: ...ompletion of this 5 minute cycle the blower will once again check the airflow switch for proper operation If the airflow switch still shows that it is closed the 5 minute loop will run again This will...

Страница 21: ...the unit cools down for 30 Seconds the fuse will reset 9 CHECK FUSE 1 24 VDC POWER Fuse 1 is tripped Check the following circuits a Overtemp switch and wiring b Check TS1 2 24 control on wiring After...

Страница 22: ...HEATER PHASE 3 This fault occurs when phase 3 current is below the current Setpoint Check for an open heater or heater fuse D ADVANCED FEATURES Advanced features allows access to extended menus To acc...

Страница 23: ...or high counter To reset this fault rotate selector dial B PHASE 2 VOLTAGE FAULT COUNTER Phase 2 voltage low or high counter To reset this fault rotate selector dial Note this fault only applies to 3...

Страница 24: ...heater fault counter is total count of open heater fault for line 1 To reset above faults rotate selector dial K LINE 2 OPEN HEATER FAULT COUNTER Line 2 open heater fault counter is total count of ope...

Страница 25: ...ll cause the unit to run for the amount of time set When the count down timer reaches zero the unit will shut down and drop indication To restart the unit the control on contact closure must be opened...

Страница 26: ...tory default is with you must be have air temp to enable EHAB E UNIT TYPE Used to select unit voltage 230V or 460V and phase 1PH or 3PH of the unit the module will be installed in The information is l...

Страница 27: ...off is selected run timer will time as long as remote is on when remote on is removed blower will stop K SELECT F OR C This parameter allows selection of Fahrenheit or Celsius Temperature display 4 F...

Страница 28: ...P N R9340 0104 28 2010 RAILWAY EQUIPMENT CO REV B 5 11...

Страница 29: ...red It closes if airflow is normal If it does not close within 10 sec after blower turn on the blower displays SAIL OFF FAULT When the airflow switch closes a 30 second prepurge time will start After...

Страница 30: ...start and run Check for proper operation VII TROUBLESHOOTING A UNIT DOES NOT START 1 Check circuit breaker 2 Check control fuses The control module has both replaceable and auto resetable fuses If the...

Страница 31: ...re is frost buildup on the air intake screens move the screens to the open position 3 Check the voltage and current levels on the blower motor 4 Make sure knockouts on the track duct are pushed all th...

Страница 32: ...head 4 To operate more than one HAB unit from a HAB unit that is controlled by a snow detector s connect terminal posts 9 together and terminal posts 10 together Do not connect terminal post 9 to term...

Страница 33: ...senses moisture the unit will operate according to the settings The unit will then operate for the duration of the run timer setting 4 FAULT CONDITION A fault condition under snow detector control wil...

Страница 34: ...and should be replaced 2 DOES NOT DETECT MOISTURE a Clean the snow detector as described in Section VIII C SNOW DETECTOR MAINTENANCE b If unit still does not detect moisture check the wiring connectio...

Страница 35: ...DC 1A or 125VAC 300mA SPECIFICATIONS 480V THREE PHASE VOLTAGE 480VAC 3PH 60HZ 125 Amp MOTOR 2HP 3450RPM TEFC 39 Amp starting current 6 Amp running current AIRFLOW 2000 CFM KW OUTPUT 50 60 KW INDICATIO...

Страница 36: ...IE DUCT POINT NOZZLE 9278 0021 ISOLATION KIT TIE DUCT TRACK NOZZLE 9278 0027 GHAB FOUNDATION 9288 0202 HEAVY DUTY OFFSET DUCT W O MIXER 9528 3404 2 INSULATED FLEX DUCT 9528 4223 TRACK DUCT 5 POINT 927...

Страница 37: ......

Страница 38: ......

Страница 39: ......

Страница 40: ......

Страница 41: ......

Страница 42: ......

Страница 43: ......

Страница 44: ......

Страница 45: ......

Страница 46: ......

Страница 47: ......

Страница 48: ......

Страница 49: ......

Страница 50: ......

Страница 51: ......

Страница 52: ......

Страница 53: ......

Страница 54: ......

Страница 55: ......

Страница 56: ......

Страница 57: ......

Страница 58: ......

Страница 59: ......

Страница 60: ...e setpoint Advanced menu password UNIT TYPE 3PH 460V Turn dial to select phase and voltage Advanced display password LOCAL WITH AIR TEMPERATURE Change setting for local switch run mode Advanced displa...

Страница 61: ...owner grants permission to Railway to open and disassemble the product as required for evaluation Railway has the sole responsibility for determining the cause an nature of failure and Railway s dete...

Страница 62: ...P N R9340 0104 38 2010 RAILWAY EQUIPMENT CO REV B 5 11 INTENTIONALLY LEFT BLANK...

Отзывы: