Set Up Checklist
• Assemble RealTrax®
• Connect the transformer
• Lubricate the engine
• Place the engine and cars on the track and couple them together
• Apply power to run as described in the Basic Operation section of these
instructions.
Tools Needed
Cotton Swab or Rag
Scissors
Pliers
Philips Screwdriver
RailKing Maintenance Kit or
Light Household Oil and Bearing Grease
Battery Charger (Optional)
Set Includes
8-Pieces
O-31 Curve RealTrax
DVD/CD-Rom
4-Pieces
Straight RealTrax
Transformer and Controller
with wire harness
F-3 Diesel Engine with Proto-Sound 2.0™
Lighted Lock-On
You can obtain replacement parts and replacement instructions from the
M.T.H. Parts Department
e-mail:
phone:
410-381-2580,
mail:
7020 Columbia Gateway Drive, Columbia MD 21046-1532
RailKing F-3 R-T-R Passenger Set with Proto-Sound® 2.0
3
Vista Dome Car
Observation Car
Coach Car