2.8  System Check

1. Run the system through a couple of cycles to ensure all components are working properly.

2. The blower timer is preset for 5 minutes delay. After the solenoid valves shut, check that the blower 

continues running for the preset number of minutes delay.

3. Open the tank and check the system.

 

a. Remove the tank lid. 

 

b. Lower the water level in the tank by opening a bath tub tap, or similar, within the residence. 

 

The floats will fall with the water level. The minimum water level is reached when the lower 

 

float drops (except on 433-S50 & 433-S50X systems where minimum water level occurs when    

 

the middle float drops). There will be an audible click and the solenoids will open allowing        

 

the tank to start filling; the blower should also start running. The water level must rise regard   

 

less of how many taps are open within the residence. 

 

c. While the tank is filling lift the lower float (middle float on 433-S50 & 433-S50X), water in  

 

 

flow should stop and the blower will remain running (until the end of the preset delay).  

 

 

Release the lower float.  

 

d.While the tank is still filling lift the upper float; water in flow should stop and the blower  

 

 

will remain running. Release the upper float. Pushing down the lower float on 433-S50    

 

 

and 433-S50X Systems will shut off the pump. 

 

e. Remember to shut off any open taps within the residence.

4. Replace the lid and secure with the fasteners provided. With the System running check the lid for 

air leaks between lid gasket and tank.  If leaks occur the fasteners should be tightened until leaks are 

eliminated.

5. Make sure you have properly labeled the system with the necessary installer information (i.e. company 

name, phone #, date installed, etc.) and you have left all system information with the home owner.

6. The AIRaider

TM

 System is now operational.

2.9  Recommended Installation Options: Overflow Protection and Alarm

1. It is recommended that a Flood Stop (P/N 28276) be installed prior to use of this system to    

 

provide point of leak detection, whereby a motorized ball valve will automatically shut off 

the system and prevent potential overflows should debris clog a shut-off valve. 

2. It is recommended that a basement Water Alarm be installed to warn residents of water tank 

overflows or system leaks.

INSTALLATION INSTRUCTIONS

1

2

Содержание AIRaider 433-S50

Страница 1: ...AIRaider Instruction Installation Manual All Residential Small System Models IN063 Rev D 0120 3 Saber Way Ward Hill MA 01835 radonaway com...

Страница 2: ...18 4 1 Six Month Service recommended 18 4 2 AnnualService required 19 4 3 Recommended Addiional Service 19 5 TROUBLE SHOOTING 20 LIMITEDWARRANTY 21 APPENDICES A 1 Pump Specification 433 S50 Systems p...

Страница 3: ...the AIRaiderTM System there are 5 items to be considered They are 1 Safety 2 Installation Site Requirements 3 Inspection of System Components 4 Necessity for Qualified Technicians 5 Knowledge of all...

Страница 4: ...e following is needed Garden Hose Five Gallon Bucket A Stop Watch or Watch with a Second Hand Or A Water Flow Meter Household water use must be discontinued during the following flow rate test Mid Ran...

Страница 5: ...uctions All wiring must be performed in accordance with the National Fire Protection Association s NFPA National Electrical Code Standard 70 current edition for all commercial and industrial work All...

Страница 6: ...System Start up 8 System Check 9 Install Overflow Protection and Alarm Prior to Use It is recommended that a Flood Stop P N 28276 sold separately be installed prior to use of this system to provide po...

Страница 7: ...nel furnace exits etc 2 2 Readying the AIRaiderTM for Installation For 433 and 321 systems 433 Illustrated This section does not apply to Systems with integral pumps 433 S50 433 S50X Systems 1 If usin...

Страница 8: ...MQ3 45 Pump Fittings required may vary with pump used The optional Bladder Tank has a MNPT threaded connection A tee will be required if the bladder tank is installed otherwise an elbow may be used a...

Страница 9: ...or gate valve in the water line to the house is required for balancing the system flow A Bladder Tank minimum capacity 5 gallons is required for 433 S50 Systems 20gal min for 433 S50X WARNING Bladder...

Страница 10: ...Page 10 of 22 IN063 Rev D 0120 3 Saber Way Ward Hill MA 01835 radonaway com INSTALLATION INSTRUCTIONS 1 2 Figure 5 Plumbing Installation 433 S50X...

Страница 11: ...Receptacle from the Jet Pump Power Cord without connecting the wires thus exposed to the jet pump inside the Jet Pump Electrical Enclosure Always secure the Jet Pump Enclosure Cover after making elect...

Страница 12: ...age 12 of 22 IN063 Rev D 0120 3 Saber Way Ward Hill MA 01835 radonaway com Figure 6 AIRaider 321ND and 433ND Wiring Diagram 115V 321ND and 433ND 115V 1Ph 60Hz Power Supply INSTALLATION INSTRUCTIONS 1...

Страница 13: ...D 0120 3 Saber Way Ward Hill MA 01835 radonaway com Figure 7 AIRaider 433 S50 X ND and 321 S50X Wiring Diagram 115V 433 S50 X ND and 321 S50X with HP Submersible Pump 115V 1PH 60Hz Power Supply INSTAL...

Страница 14: ...4 The vent line must be pitched back toward the system to prevent condensation build up 5 Cement all fittings in a manner that ensures no leakage will occur Be certain to use cement that is suitable f...

Страница 15: ...intake line from the pipe connection on the blower to the location selected for air intake Note A rubber coupling or similar means to disconnect the intake line from the is recommended 3 Connect the A...

Страница 16: ...llow pump manufac turer s instructions to prime other external pumps The normal operating range is nominally 40 PSI 60 PSI but will vary Pressure Switches on 433 S50 433 S50X factory set at 38 PSI 55...

Страница 17: ...the end of the preset delay Release the lower float d While the tank is still filling lift the upper float water in flow should stop and the blower will remain running Release the upper float Pushing...

Страница 18: ...mmended The following procedures should be followed to maintain the AIRaiderTM Check and or clean the blower air intake filter Check and or clean any filters or strainer installed on the inlet line to...

Страница 19: ...dry vac clean sediment from bottom of aeration tank if necessary Clean if necessary tank and diffusers of all mineral build up Chlorinate tank and lines by pouring cup of chlorine into the first aerat...

Страница 20: ...if applicable and clean if necessary Check fuse in control panel Check breaker at electrical panel Replace jet pump if necessary Reset jet pump as described in System Start up p 17 Check bladder tank...

Страница 21: ...ay RADONAWAY SPECIFICALLY DISCLAIMS ANY WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE THERE ARE NO WARRANTIES WHICH EXTEND BEYOND THE DESCRIPTION ON THE FACE HEREOF THERE IS NO WARRANTY OF MERCHANTABIL...

Страница 22: ...3 SaberWay Ward Hill MA 01835 Phone 800 355 0901 Fax 978 521 3964 E mail sales spruce com...

Отзывы: