2.5 Vent Line Installation
Use only 2”, 3” or 4” Schedule 40 PVC or equivalent pipe for vent line.
Follow all applicable AARST, EPA, and/or State Standards for Radon
or VOC venting.
1. Place the lid of the AIRaider
TM
on to the tank and clamp into place
using the Hex Head Screws and Washers provided.
2. Connect vent line toAIRaider
TM
lid using the enclosed rubber
coupling (See Fig. 10).
3. The vent line must be routed in a manner that allows the system
to exhaust above the level of the roof (see Fig. 11).
Note: When “Freeze Up” is posssible a minimum pipe diameter of 3” is
recommended (See Fig. 12).
4. The vent line must be pitched back toward the system to prevent
condensation build up.
5. Cement all fittings in a manner that ensures no leakage will occur.
Be certain to use cement that is suitable for potable water applications.
6. Install weather cap on top of the vent line. This cap should not
restrict air flow and must prevent rain, snow and other contaminants
from entering the vent line.
Failure to install a proper vent line
may cause contamination of the
water, outgassing of contaminants
into the building, and/or limit
system performance.
* The Manufacturer has found that vent lines less than 250 equivalent
linear feet do not cause a decrease in contaminant removal percentages.
90° Bend = 15 Equiv. Linear Ft ; 45° Bend = 7 Equiv. Linear Ft.