RadonAway AIRaider 433-S50 Скачать руководство пользователя страница 11

Page 11 of 22

IN063 Rev.D 0120

3 Saber Way, Ward Hill, MA 01835   |   radonaway.com

2.4. Electrical Hook-up

All Electrical Work should be performed in accordance with Local and State Codes, and 

NFPA National Electrical Code, Standard #70  by a Qualified and Licensed Electrician .

   

WARNING: Never perform electrical work while standing in water.  

 

 

 

 

 

Do not attempt wiring on a live circuit.

 

 

 

WARNING: Power Supply Voltage must match the voltage marked on the  

 

 

 

 

System Nameplate. Improper wiring may result in system damage.

1. Turn main power switch, located on the AIRaider

TM

, to the  “Off” position.

2. Connect the Jet Pump power cord to the Jet Pump. (Does not Apply to 433-S50 or 433-S50X

Systems, pump is factory connected) Note the Jet Pump power cord from the AIRaider

TM

 is provided 

with an electrical receptacle. The Jet Pump may be connected either by connecting a suitable power 

lead with plug and plugging into the receptacle or by removing the receptacle from the Jet Pump 

power cord  and connecting the power cord directly to the pump.  Follow wiring instructions located 

in the enclosed Jet Pump Manual.

Warning: Never remove the Receptacle from the Jet Pump Power Cord without connecting the wires 

thus exposed to the jet pump, inside the Jet Pump Electrical Enclosure. Always secure the Jet Pump 

Enclosure Cover after making electrical connections.

3. On 433-S50X units only the installer may need to disconnect the Armored Cable supplied in order 

to install the Pressure Switch. The Armored Cable may require trimming to the desired length before 

reconnecting. Connect per the wiring diagram Figure 8 Page 14.

4. Make sure all connections in the control panel are tight.

5. Bring in power to the control panel using the hole provided, either an appropriate strain relief 

bushing, or electrical conduit fitting(s), with correctly rated electrical wire or cable must be used in 

accordance with all applicable Electrical Codes.

6. Connect the power line to the control panel as shown in the applicable wiring diagram (See Figures 

6, 7, 8, 9 - on pages 12-15).

7. Connect power line to power source *. The required Voltage is either 120V or 240V and is indicated 

by an “X” marked in the check box next to either the 120V or 240V marking on the nameplate.  Follow 

all code requirements regarding wire and circuit breaker size.

* Manufacturer recommends that the AIRaider

TM

 System be directly wired to the panel on a 

dedicated circuit.

INSTALLATION INSTRUCTIONS

1

2

Содержание AIRaider 433-S50

Страница 1: ...AIRaider Instruction Installation Manual All Residential Small System Models IN063 Rev D 0120 3 Saber Way Ward Hill MA 01835 radonaway com...

Страница 2: ...18 4 1 Six Month Service recommended 18 4 2 AnnualService required 19 4 3 Recommended Addiional Service 19 5 TROUBLE SHOOTING 20 LIMITEDWARRANTY 21 APPENDICES A 1 Pump Specification 433 S50 Systems p...

Страница 3: ...the AIRaiderTM System there are 5 items to be considered They are 1 Safety 2 Installation Site Requirements 3 Inspection of System Components 4 Necessity for Qualified Technicians 5 Knowledge of all...

Страница 4: ...e following is needed Garden Hose Five Gallon Bucket A Stop Watch or Watch with a Second Hand Or A Water Flow Meter Household water use must be discontinued during the following flow rate test Mid Ran...

Страница 5: ...uctions All wiring must be performed in accordance with the National Fire Protection Association s NFPA National Electrical Code Standard 70 current edition for all commercial and industrial work All...

Страница 6: ...System Start up 8 System Check 9 Install Overflow Protection and Alarm Prior to Use It is recommended that a Flood Stop P N 28276 sold separately be installed prior to use of this system to provide po...

Страница 7: ...nel furnace exits etc 2 2 Readying the AIRaiderTM for Installation For 433 and 321 systems 433 Illustrated This section does not apply to Systems with integral pumps 433 S50 433 S50X Systems 1 If usin...

Страница 8: ...MQ3 45 Pump Fittings required may vary with pump used The optional Bladder Tank has a MNPT threaded connection A tee will be required if the bladder tank is installed otherwise an elbow may be used a...

Страница 9: ...or gate valve in the water line to the house is required for balancing the system flow A Bladder Tank minimum capacity 5 gallons is required for 433 S50 Systems 20gal min for 433 S50X WARNING Bladder...

Страница 10: ...Page 10 of 22 IN063 Rev D 0120 3 Saber Way Ward Hill MA 01835 radonaway com INSTALLATION INSTRUCTIONS 1 2 Figure 5 Plumbing Installation 433 S50X...

Страница 11: ...Receptacle from the Jet Pump Power Cord without connecting the wires thus exposed to the jet pump inside the Jet Pump Electrical Enclosure Always secure the Jet Pump Enclosure Cover after making elect...

Страница 12: ...age 12 of 22 IN063 Rev D 0120 3 Saber Way Ward Hill MA 01835 radonaway com Figure 6 AIRaider 321ND and 433ND Wiring Diagram 115V 321ND and 433ND 115V 1Ph 60Hz Power Supply INSTALLATION INSTRUCTIONS 1...

Страница 13: ...D 0120 3 Saber Way Ward Hill MA 01835 radonaway com Figure 7 AIRaider 433 S50 X ND and 321 S50X Wiring Diagram 115V 433 S50 X ND and 321 S50X with HP Submersible Pump 115V 1PH 60Hz Power Supply INSTAL...

Страница 14: ...4 The vent line must be pitched back toward the system to prevent condensation build up 5 Cement all fittings in a manner that ensures no leakage will occur Be certain to use cement that is suitable f...

Страница 15: ...intake line from the pipe connection on the blower to the location selected for air intake Note A rubber coupling or similar means to disconnect the intake line from the is recommended 3 Connect the A...

Страница 16: ...llow pump manufac turer s instructions to prime other external pumps The normal operating range is nominally 40 PSI 60 PSI but will vary Pressure Switches on 433 S50 433 S50X factory set at 38 PSI 55...

Страница 17: ...the end of the preset delay Release the lower float d While the tank is still filling lift the upper float water in flow should stop and the blower will remain running Release the upper float Pushing...

Страница 18: ...mmended The following procedures should be followed to maintain the AIRaiderTM Check and or clean the blower air intake filter Check and or clean any filters or strainer installed on the inlet line to...

Страница 19: ...dry vac clean sediment from bottom of aeration tank if necessary Clean if necessary tank and diffusers of all mineral build up Chlorinate tank and lines by pouring cup of chlorine into the first aerat...

Страница 20: ...if applicable and clean if necessary Check fuse in control panel Check breaker at electrical panel Replace jet pump if necessary Reset jet pump as described in System Start up p 17 Check bladder tank...

Страница 21: ...ay RADONAWAY SPECIFICALLY DISCLAIMS ANY WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE THERE ARE NO WARRANTIES WHICH EXTEND BEYOND THE DESCRIPTION ON THE FACE HEREOF THERE IS NO WARRANTY OF MERCHANTABIL...

Страница 22: ...3 SaberWay Ward Hill MA 01835 Phone 800 355 0901 Fax 978 521 3964 E mail sales spruce com...

Отзывы: