Radionics D9000 Series Скачать руководство пользователя страница 3

D9000/D7000 Series Installation and Troubleshooting Quick Reference

Page  3

33317D  4/97

E N T

CLEAR

V IE W   U N TE S TE D   ?

E N T

#  P T S  U N TE S TE D

N EX T

S E RV IC E   W A LK   ?

246  P TS  TO  TE S T

2 45  P T S   TO   TE S T

244 P TS  TO  TE S T

P O IN T  TE X T

P O IN T   TE X T

P O IN T  T E XT

1  PT S   TO   TE S T

0  P T S   TO   T E S T

ID L E  TE X T

P O IN T  TE X T

Test a d evice

(Tex t d isplays  60 se co nds )

Test a d evice

(Tex t d isplays  60 se co nds )

Test a d evice

Test  a  devic e

CLEAR

CLEAR

CLEAR

www.PDF-Zoo.com

firealarmresources.com

Содержание D9000 Series

Страница 1: ...icator 12 D7212Control Communicator 13 QuickReferenceTerminalDescription 14 Introduction This reference contains the very basic information a trained installer needs to install and troubleshoot a D900...

Страница 2: ...oint tested for 60 seconds After 60 seconds the display returns to the points to test message Extra Points display default text If you incorrectly set the switches on a POPIT to a point number that is...

Страница 3: ...NTESTED N EXT SERVICE WALK 246 PTS TO TEST 245 PTS TO TEST 244 PTS TO TEST POINT TEXT POINT TEXT POINT TEXT 1 PTS TO TEST 0 PTS TO TEST IDLE TEXT POINT TEXT Test a device Text displays 60 seconds Test...

Страница 4: ...d at the last address on the ZONEX bus Install a D8125 POPEX and D9127 POPITs for points 121 127 on ZONEX 1 and for points 241 247 on ZONEX 2 Sensor loop switch 1 to 8 is turned off on OctoPOPIT If th...

Страница 5: ...res input from all points in the same area programmed for sensor reset during sensor reset Two points are programmed with the same address Points programmed with the same address do not function corre...

Страница 6: ...d 24 share a common circuit breaker Check wiring and devices connected to these terminals for shorts or grounds If only one POPEX module is connected to the panel POPEX module may be incorrectly conne...

Страница 7: ...programmer connector J7 3 Check each conductor in the data power cord for continuity AC induction through the on board point sensor loops the DATA BUS or the ZONEX BUS 1 Verify a proper earth ground a...

Страница 8: ...contact your telephone company repair service Communications Failure Follow the Phone Line Trouble procedure to verify that there is no problem with the phone lines at the installation If the phone li...

Страница 9: ...s Can hear ring with test set at receiver location Line card in receiver may be faulty Review receiver manuals for trouble shooting procedures The D9412 D9112 reaches a busy signal for all ten attempt...

Страница 10: ...r t 0 0 1 3V DC PER IPH ERAL DE VICE W IR ING Z ONE X O UT 1 ZO NEX IN 1 Z ONE X O UT 2 ZO NEX IN 2 ZON EX P OWE R Z ONE X CO MM ON O p eratio n Mo nito r Puls es W he n No rma l F licke rs W h e n Ri...

Страница 11: ...UT 1 ZO NEX IN 1 ZO NE X O UT 2 ZO NEX IN 2 ZO NEX POW ER Z ON EX CO MMO N O p e ra tion M o n itor P uls es W he n N o rm al Fli cke rs W h en R ing ing PROG CONN RED YELLOW G RE EN B LA CK 1 7 0 58...

Страница 12: ...ZO NEX IN 2 ZO NEX PO WE R Z O NEX CO MMO N O p era tio n M o nit or P uls es W he n No rm al Fli cke rs W h e n R in gi ng PROG CONN RE D YELLO W GRE EN BLACK 1 7 058 23 0 02 3 2 PO W ER DATA BU S A...

Страница 13: ...ON EX IN 2 Z ON EX PO WE R ZO NEX CO MMO N Op erati on Mo nit or Pu lse s W h en No rm al F lick er s W h en Rin gi ng PROG CONN RE D Y EL LO W GREEN BLA CK 17 05 82 3 0 02 3 2 PO W ER DATA BU S A CO...

Страница 14: ...or alarm verification Shares circuit breaker with terminals 6 and 7 D136 Plug in Relay required Install a D136 in socket K1 for output at terminal 8 9 COMMON Terminal 9 is common for Auxiliary Power...

Отзывы: