At this stage, it is necessary to insert the pellet into the combustion chamber by
the operation of the pellet feeding system. In this way, we achieve a continuously
distributed pellet from the combustion chamber to the silo. The pellet mechanism
can only be started during the operation phase when the display shows "OFF"
(Pic. 17).
Loading the chamber with pellets, with the so-called manual command, do it to the top of the
parts made of gray cast iron, as shown in Picture 23.
Picture 23. Pellet level display
-
Now that we have the pellets in the combustion chamber and when it is in the zone of
the ignition heater, we can start the boiler.
-
The start is performed as follows:
Picture 24. Procedure for manual dosing of pellets, possible only in OFF mode
-
When the boiler starts igniting, Chekp Up appears on the display and, in these couple
seconds, only the fan works. During this phase, the automatic controls system is
checking if all devices required for operation are actually connected.
Содержание TKAN Integra Series
Страница 25: ...25 Slika 14 Brzi pristup nekim funkcijama sistema Slika 15 Rad sistema bez gre ke...
Страница 27: ...27 Slika 18 Prikaz funkcija ekrana...
Страница 71: ...71 Picture 14 Quick access to some system functions Picture 15 System operating without error...
Страница 73: ...73 Picture 18 Display screen functions...