36000 Kraljevo, Živojina Lazića
- Solunca br.6, Srbija
tel. +381 36 399 140, fax. +381 36 399 150, http://www.radijator.rs
e-mail: [email protected]
63
3. Assembly
3.1 General warnings
The boiler must be set correctly for proper operation!
The boiler is supplied with an external coating containing insulation, 30mm thick.
The position of the silo and the mechanism of transport of pellets is a standard factory right in
relation to the boiler.It is possible to order the factory assembled and left variant.Also, if you
need to easily make changes in the field because the silos and the whole mechanism disassemble
dosing in relation to the boiler. Electrical connections easy switsh ON easy OFF, and reassembly
is not necessary personnel specialized electrical field.
Silos for Biomax 23.1 and BioMax 35 have a flexible connection with the
transport mechanism, in order to avoid vibration during operation.
Figure3. Preview flexible connections