background image

Installation Manual 

 

COMBI  -  TA01A011.B1003 

 

 

11

CONVERSION OF GAS 

TYPE 

 

Conversion of the boiler 
from natural gas to LPG 
and viceversa must be 
performed by qualified 
personnel only. 
Conversion is performed 
as follows: 
 

a. 

turn off the main 
power switch; 

b. 

 close the gas cock; 

c. 

substitute the jets on 
the main burner as 
follows: 

 

undo the gas pipe 5 
(fig.1) from the burner 
manifold using a size 
24 spanner; 

 

separate the burner manifold 2 from the burner ramps 1 by undoing the 4 screws 3 using a Philips screwdriver; 

 

fit new jets 4 to the burner suitable for the type of gas the boiler will run on using a no. 7 spanner. The jets must be fitted 
with new gaskets; 

 

reassemble the entire burner unit. Use the soapy water method to check for gas leaks each time gas connections are 
dismantled and reassembled; 

d. 

calibrate the new max. and min. settings for the modulator. 

e. 

replace the gas setting plate that indicates the type of gas and nominal pressure for the boiler. When converting the boiler 
to work with a different type of gas, remove the existing plate and replace it with the new one supplied in the conversion kit. 

 

 

GAS DATA TABLE 

 

 

Models: 

RSF 30  E 

 

NATURAL GAS G 20 

LIQUID  BUTAN GAS G  30 

LIQUID PROPANE GAS G 31 

Lower Wobbe index (15°C; 1013 mbar)     

MJ/m3n 

45.67 80.58 

70.69 

Rated feed pressure       

mbar(mm c.w.) 

20(204) 30(306) 

37(377) 

Minimum feed pressure          

mbar(mm c.w.) 

17(173.4) 20(204) 

25(255) 

Main  burner: 17 jets - Ø jet  

mm. 

1.20 0.75 

0.75 

Consuption (15°C; 1013 mbar)                             

mc/h. 

3.65  

 

Consuption (15°C; 1013 mbar)                             

Kg/h. 

 2.72  2.68 

 

6

2

1

10

3

4

7

9

11

1

5

4
3

8

5

LEGEND

1. 

Gas valve mod. VK4105A 

2. 

Pressure modulator 

3. 

Inlet pressure point    

4. 

Outlet pressure point  

5. 

Electronic ignition board 

6. 

Gas pipe 

7. 

Burner manifold 

8. 

17 ramp gas burner 

9. 

Injectors   

10. 

Ignition electrodes 

11. 

Flame ionisation electrodes 

 

Fig. 1

Fig. 2

Содержание RSF 30

Страница 1: ...A01A011 B1003 Technical Specification RADIANT BRUCIATORI S p A Montelabbate PU ITALY ENGLISH INSTALLATION AND MAINTENANCE MANUAL FOR GAS FIRED WALL HUNG BOILERS Model RSF 30 E TYPE C ROOM SEALED SEDBU...

Страница 2: ......

Страница 3: ...EM page 3 GENERAL INSTALLATION REQUIREMENTS page 4 BOILER INSTALLATION page 6 ELECTRICAL CONNECTIONS page 8 13 BOILER CONTROL PANEL page 9 STARTING UP THE BOILER FOR THE FIRST TIME page 9 MULTIGAS OPE...

Страница 4: ...ion vessel 2 WARNINGS REGARDING INSTALLATION Warranty expires 12 months from date of installation and in all cases no later than 18 months from date of construction First start up must be performed by...

Страница 5: ...TU h 57774 Heating temperature adjustment C 30 80 Max working pressure heating bar 3 Min working pressure heating bar 0 3 Expansion vessel capacity initial pressure 1 bar Litres 10 Hot water flow rate...

Страница 6: ...USE ORIGINAL RADIANT APPROVED FLUE KIT SYSTEMS FLUE ACCESSORIES AND FLUE DIAPHRAGMS ONLY APPROVED RADIANT FLUE DIAPHRAGMS AND ADJUSTMENT TABLES ARE SUPPLIED WITH RADIANT ORIGINAL FLUE KIT SYSTEMS R C...

Страница 7: ...ework that supplies the boiler must be a 22 mm ininterrupted supply from meter to the isolation cock of the boiler The complete installation must be tested for soundness as described in the above code...

Страница 8: ...re the lowest part of the terminal is fitted less than 2m 6 6ft above a balcony above ground or above a flat roof to which people have access the terminal MUST be protected by a purpose designed guard...

Страница 9: ...lation the boiler is equipped with a fittings kit see fig 3 IMPORTANT Before connecting the heating system pipes carefully clean the system to prevent residual dirt from entering into circulation and...

Страница 10: ...with an Anti Freeze system which comes into operation when the temperature falls to 5 C Heating sensor and 4 C Hot water sensor and protects the boiler down to 10 C external temperature To protect the...

Страница 11: ...strument panel as follows A Turn off the electrical power supply at the mains B Remove the boiler front casing C Undo the two screws on the panel and turn it to the position shown in fig 1 pos 1 D Aft...

Страница 12: ...utral and earth connections have been properly connected make sure the type of gas being supplied is the same as the type for which the boiler has been tested and approved see plate data make sure the...

Страница 13: ...N position and try the ignition procedure once again If the boiler does not start reset boiler and Set the ON OFF switch 1 to OFF and then ON position IMPORTANT should the boiler fail to ignite wait 3...

Страница 14: ...ed d calibrate the new max and min settings for the modulator e replace the gas setting plate that indicates the type of gas and nominal pressure for the boiler When converting the boiler to work with...

Страница 15: ...Y THERMOSTAT 9 ELECTRONIC GAS VALVE VK4105 10 ELECTRONIC IGNITION BOARD 11 EXPANSION VESSEL 12 3 SPEED CIRCULATION PUMP WITH AIR VENT 13 AUTOMATIC AIR VENT 14 HEATING CIRCUIT 3 bar PRESSURE RELIEF VAL...

Страница 16: ...C M1 1 2 3 4 brown light blue IG black black 17 1 PWM 12 light blue 10 11 grey black RS light blue brown 13 14 16 15 L 12 11 9 10 8 7 6 5 4 3 2 N 56 1bar PAC brown black M3 55 brown brown light blue b...

Страница 17: ...tion can be made to either the remote control fig 5 or to the terminal block fig 3 dotted line on the terminals marked SE SE WARNING The remote control connection cable must pass through a channel whi...

Страница 18: ...odulation Check that the electrical connection conforms to the description in the instruction manual for the boiler Check the domestic hot water flow rate and temperature When dismantling the boiler c...

Страница 19: ...230V ES 30 108 G 00 0416 9 43157LP SEALING CLIPS KIT FOR MULTIPLEX GROUP 9 58009LP MAIN HEAT EXCHANGER mod 30 000 kCal h 9 59012LP AIR PRESSURE SWITCH CE C6065FH1748B 9 59015LA WATER PRESSURE SWITCH...

Страница 20: ...LET HAVE BEEN CAREFULLY PREPARED BUT WE RESERVE THE RIGHT TO MAKE CHANGES AND IMPROVEMENTS IN OUR PRODUCTS WHITCH MAY AFFECT THE ACCURANCY OF THE INFORMATION CONTAINED IN THIS LEAFLET E OE ALL RIGHTS...

Отзывы: