INSTALLATION INSTRUCTIONS
14
3.4 Installing the boiler
■
The appliance must be installed
exclusively on a flat vertical solid wall
capable of supporting its weight.
In order to allow access to the interior of the
boiler for maintenance purposes, it is
important that the necessary clearances
indicated in figure 1 are respected.
Note: Flue Terminal Locations must
also comply with Section 6.9 of
AS/NZS 5601.1:2010
To install the boiler, proceed as follows (see
fig. 2):
1. Use a spirit level to mark a horizontal
line (of 62 mm long) on the wall where
the boiler is to be fitted.
2. Then mark the centres of the positions
of the two wall-plugs or anchors.
Finally, mark the positions of the water
and gas pipes.
3. Drill holes into wall and install cold
water pipes, the gas supply pipe and
the central heating.
4. Fix the boiler to the wall using the wall-
plugs or anchors and connect the
pipes.
Fig. 2
MINIMUM DISTANCES IN mm
H
A
X
L
Y
Model
X
Y
L
H
1000
60
60
B
A
B
200
300
RK 34 E/B
460
Fig. 1
Содержание RK 34/B Ekobox
Страница 2: ......