2
R1BK_50-RAD-ING-Manuale-1812.1_SK.3
R
1B
K
5
0_
SK
.3
_
EN
1. SUMMARY
SUMMARY
SUMMARY
1.1.1. GENERAL INSTALLATION WARNINGS
1.1.2. BOILER LOCATION ENVIRONMENTAL REQUIREMENTS
1.1.9. CHARACTERISTICS OF THE WATER OF THE SYSTEM
1.1.12. ANTI-FREEZE PROTECTION
1.1.16. OPTIONAL ELECTRICAL CONNECTIONS - INDIVIDUAL INSTALLATION
1.1.18. TYPES OF FUME EXHAUST SYSTEMS
2.1.1. PRELIMINARY OPERATIONS FOR FIRST START-UP
2.1.3. CO2 VALUE CHECK AND CALIBRATION
2.1.4. ACCESSING AND PROGRAMMING THE PARAMETERS
2.1.5. DIGITECH CS PARAMETERS TABLE
2.1.6. ELECTRIC FAN FREQUENCY/HEAT CAPACITY DIAGRAM
2.2.7. GENERAL MAINTENANCE WARNINGS