11 |
P a g e
INSTALLATION
The installer must comply with all local and national code requirements pertaining to the
installation of this equipment.
Clearances
The ecosmart is approved for up-flow, down-flow, and horizontal configurations. Clearances do
not change with orientation. This hydronic furnace is for indoor installation only.
Clearance from
Combustibles (in)
Recommended Service
Clearance (in)
Top
0
0
Bottom
0
0
Front
0
24
Back
0
0
Sides
0
0
Freeze Protection
It is not recommended to install the ecosmart in an unheated space.
Should the ecosmart be installed in an area where the ambient temperature may fall below
freezing, ethylene or propylene glycol should be added into the hydronic heating system to
protect against damage, which would not be covered under warranty. Make sure the glycol is
compatible with all system components and is permitted by local and national codes.
Rear Piping Connections
The heating coil may be reversed to allow rear piping:
Remove upper door
Disconnect supply air sensor from extension cable
Slide out heating coil
Re-mount supply air sensor and grommet to opposite end of heating coil
Remove rear knock-outs
Slide in heating coil
Use plastic plugs (provided) to close up holes on upper door