COMMISSIONING
Commissioning
must
be carried out in accordance with these instructions, and
must
be conducted by designated, qualified and competent personnel.
1.
Make sure that the system is powered and the display on the Electronics Module
is illuminated.
2.
Flood the system in the following sequence:
•
Open the cold water supply isolation valve(s).
• Open the outlet flow isolation valve(s).
•
Open the hot water supply isolation valve(s).
3.
Make sure the hot and cold inlet supplies are at their designated pressures and
temperatures.
4.
Close all the mixed water outlets and turn on the circulating pump.
5.
The LCD display will indicate the outlet water temperature and the outlet water
temperature setpoint. The setpoint is preprogrammed to 49ºC. This can be
altered using the
'DRV Programming Software'
on the USB stick supplied.
Temp. 48˚C
Setpoint 49˚C
drv40
Rada
Temp. 48˚C
Setpoint 49˚C
Display as seen during normal operating mode
Current Outlet Temperature
Current Setpoint
Содержание DRV40
Страница 43: ...43 Step 5 Step 6 ...
Страница 46: ...46 2 5mm HEX 3mm HEX 13mm HEX Step 1 Step 3 Step 4 Step 2 Seals shown 1 1 when printed at Full Scale ...
Страница 47: ...47 3mm HEX Step 5 3mm HEX Step 6 ...
Страница 48: ...48 3mm HEX Step 7 Step 7a Step 7b Seals shown 1 1 when printed at Full Scale ...
Страница 50: ...50 Only use silicone based lubricants on rubber seals A D E E E D B C 1793 215 Seal Pack Step 10 ...
Страница 51: ...51 A D B E C x 2 x 3 Seals shown 1 1 when printed at Full Scale ...
Страница 54: ...54 Calibrate HotEnd Valve Reset Temp 48 C Setpoint 49 C drv40 Rada 6 Wait for the DRV40 to reset ...
Страница 70: ...70 NOTES ...
Страница 71: ...71 NOTES ...