4
The following outline describes the basic process for bringing your
RTU online:
1.
Move Battery Jumper, see Section 2.0
2.
Mount RTU, see Section 3.0
3.
Mount and wire antenna, if separate, see Appendix A
4.
Wire power, see Section 6.0
5.
Wire inputs, see Appendix B
6.
Set Template, see Section 8.0 & Appendix B
7.
Transfer Import Code to CSA, if CSA is at a different location
8.
Verify RTU has been imported into system
9.
Verify Test Call phone number has been entered at the web
site
10.
Test RTU, see Sections 12.0, 13.0, & 14.0
Содержание AlarmAgent.com AA-102DC
Страница 1: ...RACO MANUFACTURING ENGINEERING COMPANY AA RTU Installation Manual v3 2...
Страница 6: ...5...
Страница 7: ...6 RTU Interior View...
Страница 34: ...33 Solar Power Mode Wiring Diagram...
Страница 35: ...34...
Страница 36: ...35...
Страница 37: ...36...
Страница 40: ......
Страница 41: ...40 Appendix G AlarmAgentTM RTU Digital Upgrade Field Wiring Worksheets...
Страница 42: ...41...