Transport to the Installation Site
Only trained personnel may be used for the following work:
•
Transport the lift table
•
Unloading the lift table
•
Check delivery condition of the lift table
6.1
Unloading the Lift Table
There is an increased risk of accidents when unloading and transporting the lift table!
The lift table can fall or tip over due to its weight!
Use only suitable and technically perfect lifting gear and suspension systems with an
adequate lifting capacity of 500 kg.
Only transport the lift table on level, solid ground!
When placing the lift table, pay attention to the possible danger of crushing in the area
of stationary objects around the lift table!
Warning: Increased risk of injury and death! Never stand under the load when lifting
and putting it down! Instruct bystanders to leave the danger zone!
Warning: Increased risk of injury and death! Do not enter or climb onto the forklift
platform during transport!
Increased risk of crushing feet and toes! Wear steel-toed safety shoes!
Unloading by forklift truck
•
With the forks set appropriately, drive centrally into the designated places on the freight pallet on the longi-
tudinal side of the lift table and lift carefully.
•
Carefully lift the HS 300 MIDI from the truck. The net weight is approx. 85 kg (FH) resp. approx. 110 kg (AH).
Check delivery condition
Check for completeness and transport damage. In case of transport damage or missing parts, document these
immediately on the consignment note of the transport company. At the same time, inform the manufacturer of
the situation.
Unpacking and placing
Unpack the lift table and remove the packing material. Lift the HS 300 MIDI from the transport pallet with a
forklift. When doing so, drive under the centre of the long side of the lift table with appropriately adjusted forks
and carefully lift slightly. Then lift carefully from the pallet, remove the pallet and set the lift table down on the
ground.
Fire hazard! Do not smoke or light an open fire.
Dispose of the packaging material in an environmentally friendly manner!
Transport to the installation site
After unpacking, the lift table can be moved to the installation site either via its four swivel castors or using a
suitable means of transport. If a forklift or lift truck is used for this purpose, the general safety regulations must
be followed and observed.
Содержание HS 300 MIDI
Страница 25: ...25 BA_BM_HS 300 MIDI_EN_44 21 docx...
Страница 26: ...26 BA_BM_HS 300 MIDI_EN_44 21 docx CHARGING PROGRAM...
Страница 27: ...27 BA_BM_HS 300 MIDI_EN_44 21 docx...
Страница 28: ...28 BA_BM_HS 300 MIDI_EN_44 21 docx...