22
Installation.and.Maintenance
Service Manual
9. Maintenance
9.1 Precautions before Performing Inspection or Repair
There.are.high-capacity.electrolytic.capacitors.on.the.outdoor.mainboard..Thus,.even.the.power.is.cut.off,.there.is.high.voltage.
inside.the.capacitors.and.it.needs.more.than.20min.to.reduce.the.voltage.to.safety.value..Touching.the.electrolytic.capacitor.within.
20min.after.cutting.the.power.will.cause.electric.shock..If.maintenance.is.needed,.follow.the.steps.below.to.discharge.electricity.of.
electrolytic.capacitor.after.power.off.
(1).Open.the.top.cover.of.outdoor.unit.and.then.remove.the.cover.of.electric.box.
(2).As.shown.in.the.fig.below,.connect.the.plug.of.discharge.resistance.(about.100ohm,.20W).(if.there.is.no.discharge.resistance,.
you.can.use.the.plug.of.soldering.iron).to.point.A.and.B.of.electrolytic.capacitor..There.will.be.sparks.when.touching.them..Press.
them.forcibly.for.30s.to.discharge.electricity.of.electrolytic.capacitor.
(3).After.finish.discharging.electricity,.measure.the.voltage.between.point.A.and.B.with.universal.meter.to.make.sure.if.electricity.
discharging.is.completed,.in.order.to.prevent.electric.shock..If.the.voltage.between.the.two.points.is.below.20V,.you.can.perform.
maintenance.safely.
A
B
A
B
electric.box
outdoor.mainboard(AP1)
outdoor.mainboard(AP1)
discharge.resistance.or.
plug.of.soldering.iron
Fig.29
Fig.30
Содержание QSFMO-D2
Страница 1: ...Service Manual Model QSFMO D2 QSFMO T3 QSFMO Q4 Refrigerant R410A...
Страница 55: ...JF00301856...