background image

11

STEP 6

Pressurizing Air Bottle Cylinders

1.  IMPORTANT: Make sure lift frames are in the fully 

lowered position during the following procedures.

2.   Remove dust cap from each air inflation valve.

 

 

 

 

3.   If the valve hasn’t been opened for a while, use a 

valve tool to release a short hiss of air to check valve 

for proper operation and to drain any accumulated oil. 

Holding the valve open deflates the air bottle cylinder.

4.   Using a pump or air compressor, inflate each air 

bottle cylinder to 50-PSI. Pull the connector off quickly 

parallel to the valve to minimize air loss.

 

 

 

 

 

5.  Press the air pressure gauge evenly onto the valve 

stem and record the reading given. If there is a 

hissing sound, the gauge is not tight or even enough for 

an accurate reading. 

DO NOT EXCEED 50-PSI.

6.   Replace dust caps. The dust cap on each inflation 

valve helps to retain air. If the valve does not have a cap, 

the air bottle cylinders may deflate noticeably sooner.

STEP 7 

Power Unit Assembly

1. 

IMPORTANT: 

Mount the Power Unit to carrier using 

round spacers and bolts.

Содержание BL-3500

Страница 1: ...fety in mind However your overall safety can be increased with proper training and thoughtful operation on the part of the operator DO NOT operate or repair this equipment without reading this manual...

Страница 2: ...ts for the first 12 months only on parts returned as previously described The warranty does not extend to t Defects caused by ordinary wear abuse misuse negligence shipping damage improper installatio...

Страница 3: ...es 10 Pressurizing Air Bottle Cylinders Power Unit Assembly 11 Power Unit Assembly Cont d 12 Filling Power Unit Reservoir Preparing Hoses 13 Preparing Hoses Cont d 14 Jack Preparation 15 16 Bleeding t...

Страница 4: ...4...

Страница 5: ...it only with authorized or approved replacement parts t Keep all instructions permanently with the unit and all decals on the unit clean and visible INSTALLER OPERATOR PLEASE READ AND FULLY UNDERSTAND...

Страница 6: ...hen lowering Avoid pinch points 8 Use only as described in this operation manual Use only manufacturer s recommended attachments 9 ALWAYS WEAR SAFETY GLASSES Everyday eyeglasses only have impact resis...

Страница 7: ...apsed Height 3 76 mm 3 76 mm Standard Motor 110VAC 60 Hz 1Ph 110VAC 60 Hz 1Ph Optional 12 Volt DC Motor available The design material and specifications are subject to change without notice BL 3500 BL...

Страница 8: ...Kgs Frame Length Overall 71 5 1816 mm Frame Width 11 25 286 mm Rubber Lift Block Position Min 34 862 mm Rubber Lift Block Position Max 60 1523 mm Platform Lifting Height Frame Only 17 5 447 mm Platfor...

Страница 9: ...y or death STEP 3 Unpacking 1 After choosing the area of installation open packaging and remove the frames handles hoses and power unit 2 Place the QuickJack frames near work area STEP 4 Installing Cy...

Страница 10: ...e cylinders 2 Wrap the threads on the two air inflation valves with Teflon tape When applying tape wrap it three times in direction shown below 3 Carefully thread each air inflation valve into each ai...

Страница 11: ...Using a pump or air compressor inflate each air bottle cylinder to 50 PSI Pull the connector off quickly parallel to the valve to minimize air loss 5 Press the air pressure gauge evenly onto the valv...

Страница 12: ...RING SIDE 4 Place one double male O ring fitting in the lower port with the O ring facing inward 5 Securely tighten fitting 6 Install male quick connect fitting to lower double male fitting 7 Securely...

Страница 13: ...tighten firmly STEP 9 Preparing Hoses READ THE FOLLOWING PROCEDURES BEFORE ATTEMPTING TO CONNECT HOSES TO QUICKJACK AND POWER UNIT 1 Remove protective caps from threaded fittings on both ends of Twin...

Страница 14: ...from threaded fittings 7 Wrap threaded ends with Teflon tape at least three times Tape should be wrapped in direction shown below 8 Locate the two remaining male quick connect fittings and attach to S...

Страница 15: ...ECT Install the male fitting into the female fitting Full connection is made when the ball release sleeve slides forward on the female fitting TO DISCONNECT Hold the male fitting then retract the slee...

Страница 16: ...check all electrical connections 11 Cycle the jack up and down a few times to approximately half the lifting height ensuring proper operation 12 Engage safety bars and lower jack onto safeties by dep...

Страница 17: ...ehicles INSIDE OUT and OUTSIDE IN INSIDE OUT In this method the QuickJack frames are positioned directly adjacent each other while the vehicle rolls over into position Quick Frame Handles are typicall...

Страница 18: ...manufacturers recommended lifting points Typical vehicle jacking points are illustrated below TO RAISE JACK FRAMES 1 Before raising vehicle be sure all personnel are clear of the surrounding area IF T...

Страница 19: ...ES ARE PARALLEL WITHIN 2 AND ALIGNED EVENLY FRONT AND BACK AS SHOWN IN THE DIAGRAM FAILURE TO DO SO COULD CAUSE QUICKJACK FRAMES TO BECOME UNSTABLE AND NOT REST SQUARELY ON FLOOR SURFACE LONGITUDINAL...

Страница 20: ...respective receiver 2 before nearing elevated vehicle STAY ALERT Use common sense and watch what you are doing Remember SAFETY FIRST TO LOWER JACK FRAMES 1 Ensure that load is firmly positioned and se...

Страница 21: ...ic system is under pressure t Keep dust caps on hose couplers when not in use t Use every precaution to guard against dirt entering the system t USE CAUTION if using thread sealant or Teflon tape when...

Страница 22: ...in the proper manner Never use lifting adapters other than what is approved by the manufacturer t CLEAR AREA if vehicle is on danger of falling t STAY ALERT Watch what you are doing Use common sense B...

Страница 23: ...T The QuickJack SUV and Light Truck Adapter Kit fits the BL 5000 Series Models Only This is an OPTIONAL item Sold separately The adapter kit includes 4 3 Receivers 4 3 Stackable Risers 4 Drop in Conta...

Страница 24: ...530262 HHB 3 8 16 x 1 2 2 19 5550093 FTG NPL 06 ORB x 04 NPT 2 20 5930575 50 PLASTIC STRAPPING 3 21 5736018 WUXI POWER UNIT ADAPTER BL SERIES 1 22 5530783 FHPS 3 8 16 x 75 2 REVISION REV DESCRIPTION D...

Страница 25: ...ATE EDITED BY ECO D UPDATED BOM REVISIONS 10 30 2014 TM 00671 E UPDATED BOM REVISION 2 23 2015 MR 00682 F REPLACED 5905735 WITH 5905933 REPLACED 5905740 WITH 5905932 UPDATED BOM REVISION 3 10 2015 VB...

Страница 26: ...x 20 4 10 5545026 WASHER M6 x 12 SL 10 11 5535357 NUT M6 x 1 0 NL 10 12 5716179 PLASTIC TUBE COVER 12mm 8 13 5550055 FTG NPL 02 STM x 02 NPT 1 14 5716192 BL SERIES PLASTIC WHEEL 2 A 15 5530027 HHB M6...

Страница 27: ...103 FTG ELB 04 JIC 06 ORB 2 17 5585426 110V AC POWER UNIT 1 18 5530262 HHB 3 8 16 x 1 2 2 19 5550093 FTG NPL 06 ORB x 04 NPT 2 20 5930575 50 PLASTIC STRAPPING 3 A 21 5716027 BL SERIES PLATIC WUXI POWE...

Страница 28: ...DATE EDITED BY ECO D UPDATED BOM REVISIONS 10 30 2014 TM 00671 E UPDATED BOM REVISION 2 20 2015 MR 00682 F REPLACED 5905735 WITH 5905932 REPLACED 5905840 WITH 5905933 UPDATED BOM REVISION 3 10 2015 VB...

Страница 29: ...44 FHPS M6 x 1 x 20 4 10 5545026 WASHER M6 x 12 SL 10 11 5535357 NUT M6 x 1 0 NL 10 12 5716198 PLASTIC TUBE COVER 19mm 8 13 5550055 FTG NPL 02 STM x 02 NPT 1 14 5716192 BL SERIES PLASTIC WHEEL 2 A 15...

Страница 30: ...SERIES 1 A 11 5530783 FHPS 3 8 16 x 75 2 REVISION REV DESCRIPTION DATE EDITED BY ECO A PRODUCTION RELEASE 10 23 2013 TM 00633 B UPDATED BOM REVISION 03 05 2014 DB 00644 C REPLACED 5550065 WITH 555003...

Страница 31: ...UCTION RELEASE DERIVED FROM 5260238 10 29 2014 TM 00671 B UPDATED BOM REVISION 2 23 2015 MR 00682 C UPDTED BOM REVISION RENAMED WAS BL 4500 NOW BL 5000XL REPLACED 5930624 WITH 5905932 REPLACED 5930626...

Страница 32: ...JACK By Ranger Products P N 5900395 NOTE Every effort has been taken to ensure complete and accurate instructions have been included in this manual however possible product updates revisions and or ch...

Отзывы: