MANUAL DE USUARIO
11
Cut the pipe to the proper length to install the electrolysis cell. To do this, you can use the
supplied template and follow the steps below:
You can then install accessories to mount the flow sensor to the pipe. To do this, glue the tee
fitting to the upper part of the pipe.
The measures required for each of these elements are as follows:
1)
Place the template horizontally along the
pipe where you want to install the equipment.
2)
Using a permanent marker, mark 4 lines on
the tube through the slots in the template.
3)
Remove the template and cut the PVC pipe
at the two points marked A.
Pay attention
and make sure you cut the correct points (the
two lines on the inside).
4)
Apply cleaner between the ends resulting
from the cut, and the points marked as B.
Also clean the fittings to be glued. Be sure to
choose the right ones for your pipe (two sets
of sizes are provided: 1 1/3” and 2”).
5)
Apply PVC glue all around the cut pipe and
the fitting to be glued, and press the fitting
into the pipe until it stops.
6)
Repeat the operation with the fitting and
pipe on the opposite side.
7)
Wait for the glue to harden. The waiting
time will depend on the glue used, please
refer to the product instructions carefully.
2.3.1. Cutting and gluing of accessories
Cutting marks
- Electrolysis cell:
Minimum 14 inches.
- Flow sensor:
Minimum 4 inches.
Both elements must be installed in the same pipe. It is important that the water flows first through the flow
sensor, and then through the electrolysis cell.
Never install the flow sensor after the cell, as it would be damaged.
Содержание QUICKSALT20
Страница 1: ...MANUAL DE USUARIO 1 USER S GUIDE 20 40 60...
Страница 4: ...MANUAL DE USUARIO 4...
Страница 27: ...MANUAL DE USUARIO 27...
Страница 28: ...U S Office 1680 Michigan Avenue suite 700 Miami Beach Florida 33139...