3
Getting Started
Read and review the following information before starting the assembly and installation of the unit.
There are several tasks in the "Installation and assembly requirements" section (see
"Installation and
assembly requirements" below
) that must be completed before you can start the installation.
There is also additional information to help you prepare and perform a safe and efficient installation.
Baseline installation procedure
This assembly installation procedure provides a baseline procedure that will reliably install the unit.
With experience you may find more efficient methods of installation. Always verify changes and/or
alternate methods of assembly and installing the unit with the Precor Queenax installation coordinator.
IMPORTANT
: Always verify any procedural changes or alternative methods to this installation
procedure with the Precor Queenax installation coordinator.
Installation and assembly requirements
You must have the following items and conditions before you can start the equipment installation.
l
Site Survey: You must have an approved site survey before you can install the unit.
WARNING
: Review the site survey prior to ANY drilling and make sure that there are no
conditions or obstacles (such as electrical conduit, post-tension rebar, etc.) that could cause
personal or facility damage while drilling.
l
Rendering: You must have a copy of the unit build rendering before starting installation.
l
Beams and fasteners: You must have the correct number of beams. Use the rendering to
verify that the correct number of beams have been received. If the unit includes overhead
beams, make sure the correct number of beam joining fastener packages were received.
l
Room Size: Verify that the room is large enough to install and use the unit.
o
Make sure the room height, including any hanging obstructions such as sprinklers and
light fixtures, will not interfere with the height requirements.
o
Make sure that there is enough space around the unit to allow installation and use of the
optionals and training apps without interference.
Receiving Parts
l
Use the rendering and parts invoices (packing list) to verify that all listed part boxes were
received.
7
3 Getting Started
Baseline installation procedure