c. Install the three anchor bolts and secure using the washer and nut. Fully tighten each
floor fixing anchor bolt and torque to specification 37 ft-lbs, (50 Nm).
d. Fully tighten the four tower anchor bolt and torque to specification 37 ft-lbs, (50 Nm).
e. Reinstall the front floor fixing front mini bar 25s and fully tighten fasteners.
f. Repeat the anchor bolt installation process for each tower.
21
4 Assembly and Installation
Procedure